MEC98-03913
| INSP - Final | 11/25/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | A | PASS |
|
|
Scheduled by Hello!. Contact phone is [3899901]. gas test by intmtn gas? looks ok, damper removed.
|
MEC98-03913
| INSP - Final | 11/25/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | A | PASS |
|
|
Scheduled by Hello!. Contact phone is [3899901]. gas test by intmtn gas? looks ok, damper removed.
|
BLD98-02819
| INSP - Framing/Rough-in | 11/27/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | A | PART |
|
|
enclose existing roofed area...342 JOB, LOOKS OK
|
BLD98-03159
| INSP - Framing/Rough-in | 11/27/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | P | PART |
|
|
tim ###-#### verify proper hold downs hold downs appear ok...
|
BLD98-03290
| INSP - Framing/Rough-in | 11/27/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | P | PASS |
|
|
conf on framing/ final insp.
|
MEC98-04000
| INSP - Framing/ Rough-in | 11/24/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | P | PART |
|
|
JUDY ###-####...p/t ok, asked to support csst at proper interval, check at frame.
|
BLD98-02697
| INSP - Framing/Rough-in | 11/27/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | P | PART |
|
|
tim ###-####; add'l c/n, header missed at brg wall, add rotation & squash blocks at brg pony wall. header installed while onsite...ok to cover, check under floor at final.
|
BLD98-02697
| INSP - Energy code compliance | 11/27/1998 | 11/27/1998 | 11/27/1998 12:00:00 AM | P | PART |
|
|
tim ###-####...ok to cover, has frame c/n. check floor insul at final.
|