Inspections for the day of: Tuesday, November 27, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00644 BLD-Energy code compliance11/26/200111/27/200111/27/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/26/2001 at 10:43:08. Contact: ###-####.
BLD01-02789 BLD-Framing/Rough-in11/26/200111/27/200111/27/2001 12:00:00 AMAPASS
shear walls\###-#### dan c/n made ok for nailling. 11/26/2001 2:34:05 PM
BLD01-02374 BLD-Footing11/26/200111/27/200111/27/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/26/2001 at 12:31:35. Contact: ###-####. c/n for ft in garage made ok. 11/27/2001 9:16:48 AM
BLD01-01268 BLD-Framing/Rough-in11/26/200111/27/200111/27/2001 12:00:00 AMAPART
###-#### erin roof nailling ok 11/27/2001 12:28:14 PM
BLD01-01982 BLD-Energy code compliance11/26/200111/27/200111/27/2001 12:00:00 AMAPART
LARRY ###-#### c/n for gas line protection plates 11/27/2001 10:05:55 STYLE PER LISTING. REINSP REQUIRED OK TO COVER 2 ND FLOOR ONLY. 11/27/2001 10:06:52 AM
BLD01-02493 BLD-Energy code compliance11/27/200111/27/200111/27/2001 12:00:00 AMPFAIL
###-#### insulation and wire to close to b vent/ need justavacation of hole for wirw in double girder truss hall/ closet. 11/27/2001 2:36:39 PM
BLD01-01268 BLD-Framing/Rough-in11/27/200111/27/200111/27/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/27/2001 at 08:39:20. Contact: ###-####. roof nailling ok pending hard copy from engineer to back up verbal discution. 11/27/2001 1:57:46 PM
BLD01-02539 BLD-Framing/Rough-in11/27/200111/27/200111/27/2001 12:00:00 AMPPART
###-#### ok to do permitor on celling/ corridor is tunnelized 1 hr const. 11/27/2001 1:56:36 PM