BLD01-00644
| BLD-Energy code compliance | 11/26/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 10:43:08. Contact: ###-####.
|
BLD01-02789
| BLD-Framing/Rough-in | 11/26/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | A | PASS |
|
|
shear walls\###-#### dan c/n made ok for nailling. 11/26/2001 2:34:05 PM
|
BLD01-02374
| BLD-Footing | 11/26/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 12:31:35. Contact: ###-####. c/n for ft in garage made ok. 11/27/2001 9:16:48 AM
|
BLD01-01268
| BLD-Framing/Rough-in | 11/26/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | A | PART |
|
|
###-#### erin roof nailling ok 11/27/2001 12:28:14 PM
|
BLD01-01982
| BLD-Energy code compliance | 11/26/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | A | PART |
|
|
LARRY ###-#### c/n for gas line protection plates 11/27/2001 10:05:55 STYLE PER LISTING. REINSP REQUIRED OK TO COVER 2 ND FLOOR ONLY. 11/27/2001 10:06:52 AM
|
BLD01-02493
| BLD-Energy code compliance | 11/27/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | P | FAIL |
|
|
###-#### insulation and wire to close to b vent/ need justavacation of hole for wirw in double girder truss hall/ closet. 11/27/2001 2:36:39 PM
|
BLD01-01268
| BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 08:39:20. Contact: ###-####. roof nailling ok pending hard copy from engineer to back up verbal discution. 11/27/2001 1:57:46 PM
|
BLD01-02539
| BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 12:00:00 AM | P | PART |
|
|
###-#### ok to do permitor on celling/ corridor is tunnelized 1 hr const. 11/27/2001 1:56:36 PM
|