Inspections for the day of: Monday, November 27, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00498 INSP-Supply line flush11/27/200611/27/200611/27/2006 4:48:07 PMPPASS
Underground flush passed.
FIR06-00500 INSP-Supply line flush11/27/200611/27/200611/27/2006 4:47:48 PMPPASS
Underground flush passed
FIR05-00536 INSP-Sprinkler Rough-in11/27/200611/27/200611/27/2006 4:47:23 PMPPASS
See city approved plans for locations in the basement that the ceiling tile can be installed.
BLD06-00102 FIRE-Conference11/27/200611/27/200611/27/2006 2:47:23 PMPDONE
I went to the job site and went over the fire lane requirements with the contractors of both buildings. It appears the two separate parking lots are not connected as they were shown on the approved plans. I refered them to Scott. I was contacted by Scott later in the day and he stated that after meeting them and going over the plans that the way the parking lots are installed will be satifactory for fire department access.
FIR06-00841 INSP-Sprinkler Rough-in/Hydro11/27/200611/27/200611/27/2006 2:20:43 PMAPART
Sprinkler piping rough-in passed. Several heads do do meet the spacing requirements from the wall mounted supply diffusers. Per tom and I's discussion he will provide an intermerdiate temp head. Piping cannot be covered until a tenting inspection has been performed.
FIR06-00847 INSP-Final Inspection11/22/200611/27/200611/27/2006 9:16:38 AMAFAIL
No access to the business. All lights are off.