BLD05-02148
| FIRE-Final Inspection | 11/27/2007 | 11/27/2007 | 12/5/2007 4:49:17 PM | P | PASS |
|
|
Fire life safety inspection passed, one missing extinguisher installed while on site, also noted exit paths to remain clear at all times, exit doors cannot be blocked or obstructed- pallets and boxes at the SW exit door to be removed immediately, inspection record card not available on site for signature.
|
FIR07-00205
| INSP-Final Inspection | 11/26/2007 | 11/27/2007 | 11/28/2007 11:13:09 AM | P | PART |
|
|
Reinspection for the cleanroom area defficiencies passed, also inspected first floor and mech. penthouse added and relocated heads due coverage issues.
|
FIR07-00234
| INSP-Sprinkler Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 2:56:40 PM | A | PART |
|
|
Underground flush passed as per KR
|
FIR07-00236
| INSP-Sprinkler Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 2:55:58 PM | A | PART |
|
|
Underground flush passed as per KR
|
FIR07-00905
| INSP-Sprinkler Rough-in/Hydro | 11/21/2007 | 11/27/2007 | 11/27/2007 2:18:41 PM | P | PASS |
|
|
Underground hydro passed..will be capped off until future building is built..As per KR
|
FIR07-00333
| INSP-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 2:05:04 PM | A | CANC |
|
|
Overbooked.
|
FIR07-00129
| INSP-Final Inspection | 11/27/2007 | 11/27/2007 | 11/27/2007 2:04:21 PM | P | CANC |
|
|
Overbooked.
|
FIR06-00504
| INSP-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 1:48:10 PM | P | CANC |
|
|
Overbooked
|
BLD07-02607
| FIRE-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 12:29:13 PM | A | PASS |
|
|
All corrections were made as per forrest notes.Per KR
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 11/26/2007 | 11/27/2007 | 11/27/2007 12:08:54 PM | A | PART |
|
|
Hydro test passed. Ok to cover northwest side of the third floor. As per KR
|
FIR06-00763
| FIR-Aging Inspection | 11/27/2007 | 11/27/2007 | 11/27/2007 11:34:48 AM | | DEFR |
|
|
wip
|
FIR07-00827
| INSP-Sprinkler Rough-in | 11/27/2007 | 11/27/2007 | 11/27/2007 11:33:03 AM | P | PART |
|
|
Noted on approved plans areas okayed for cover, noted one existing head to be removed and one overspaced head off an adjacent wall.
|
FIR07-00702
| INSP-Sprinkler Rough-in/Hydro | 11/26/2007 | 11/27/2007 | 11/27/2007 11:31:04 AM | A | PART |
|
|
See stamped plans for rooms initialed as approved for cover.
|
FIR07-00235
| INSP-Sprinkler Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 10:34:45 AM | A | PART |
|
|
UG fire supply line flush completed okay.
|
FIR07-00233
| INSP-Sprinkler Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 10:32:27 AM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR05-00033
| INSP-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 9:58:16 AM | A | PART |
|
|
Testing completed for notification devices at the basement, first and third floors, also completed initiating device testing including all smoke detectors, ansul kitchen system, waterflow, pull station. Final pending the installation of notification devices at floors, rooms and areas currently occupied but indicated on the plans as "unoccupied" and therefore are missing required coverage. See clouded red lines on approved set for locations at the basement, 1st, 2nd and 4th floors.
|
FIR07-00425
| INSP-Sprinkler Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 9:42:52 AM | A | PART |
|
|
Cold cavity protection at the 5th floor is satisfactory as completed to date. Noted two apts. at the SW are not finished and will need inspection prior to approval for cover, heads at the trash chute are not yet connected.
|
FIR07-00432
| INSP-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 9:23:46 AM | A | PASS |
|
|
Check the function of the new control relays to fire pump and IT power shut down. Pass. As per KR
|
BLD06-00470
| FIRE-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 8:56:01 AM | A | PASS |
|
|
Dead bolt removed from door.Fire life safety passed.Per KR
|
FIR07-00481
| INSP-Supply line flush | 11/26/2007 | 11/27/2007 | 11/27/2007 12:00:00 AM | A | CANC |
|
|
Garret ###-####
|
FIR07-00905
| INSP-Sprinkler Rough-in/Hydro | 11/21/2007 | 11/27/2007 | 11/21/2007 12:01:13 PM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|