Inspections for the day of: Tuesday, November 27, 2007.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00637 INSP-Sprinkler Rough-in11/26/200711/27/200711/27/2007 5:51:04 PMPPART
The north canopy piping has been corrected and can be covered. The west canopy piping has not been corrected and can not be covered. The remaining hard lids on the second floor can be covered. These were the only three items inspected today.
FIR07-00770 INSP-Final Inspection11/26/200711/27/200711/27/2007 3:21:06 PMAFAIL
The duct smoke detectors still need to be tested. Per tim not all of the units are shutting down upon detection of smoke. The notification circuits have been repaired and tested. The smoke detectors located over the nac panels have been relocated to the deck and tested.
BLD07-01138 FIRE-Final Inspection11/26/200711/27/200711/27/2007 3:17:22 PMPPASS
life safety passed
BLD07-01151 FIRE-Final Inspection11/27/200711/27/200711/27/2007 3:16:21 PMPPASS
life safety passed.
FIR07-00528 INSP-Final Inspection11/27/200711/27/200711/27/2007 2:31:52 PMPPASS
permit finaled
BLD07-00735 FIRE-Final Inspection11/27/200711/27/200711/27/2007 2:31:10 PMPPASS
Life safety passed
BLD07-02898 FIRE-Final Inspection11/27/200711/27/200711/27/2007 1:41:46 PMPFAIL
See the city approved plans for locations of the deficiencies.
BLD07-01553 FIRE-Final Inspection11/27/200711/27/200711/27/2007 1:27:56 PMPFAIL
Need to have original copy of approved set of plans with plan review notes on site.Also need to add building address on front of building.Per KR
FIR07-00824 INSP-Sprinkler Rough-in/Hydro11/27/200711/27/200711/27/2007 12:34:52 PMPPASS
Underground hydro test passed
BLD07-03032 FIRE-Final Inspection11/26/200711/27/200711/27/2007 11:53:25 AMAPASS
Permit finaled.
BLD07-01261 FIRE-Final Inspection11/27/200711/27/200711/27/2007 11:46:40 AMPPASS
All life safety corrections were made including new set of city aproved set of sprinkler plans with changes..Per KR
FIR07-00782 INSP-Final Inspection11/27/200711/27/200711/27/2007 11:43:04 AMPPASS
overhead finaled, new set of city approved plans on site with all changesmade and approved..Per KR
FIR07-00756 INSP-Final Inspection11/27/200711/27/200711/27/2007 11:40:27 AMPPASS
Underground fire permit finaled
FIR07-00640 INSP-Final Inspection11/21/200711/27/200711/27/2007 10:28:16 AMACANC
###-#### - bud Cancelled due to additional strobe being required on the latest plans.
BLD07-01225 FIRE-Final Inspection11/26/200711/27/200711/27/2007 8:58:45 AMAPASS
life safety passed.
FIR06-00178 INSP-Final Inspection11/21/200711/27/200711/27/2007 8:12:12 AMAPASS
Permit finaled