ESC13-00468
| Tracking Control | 11/27/2013 | 11/27/2013 | 11/27/2013 4:15:48 PM | P | FAIL |
|
|
No corrective actions taken. RP notified of second Correction Notice.
|
ESC13-00218
| Aging Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 2:59:57 PM | | PASS |
|
|
Finaled.
|
ESC13-00218
| DOC - Permit Finaled | 11/27/2013 | 11/27/2013 | 11/27/2013 2:59:31 PM | P | PASS |
|
|
Townhouse is complete, landscaped, and stabilized. No further ESC inspections required. All other permits finaled.
|
ESC12-00768
| BMP Violation | 11/27/2013 | 11/27/2013 | 11/27/2013 2:40:51 PM | P | PASS |
|
|
Disturbed hillside where sewer and water lines were installed has been stabilized with geotextile mat and additional wattles. DI protection on adjacent stormwater structures is adequate. Corrective actions are approved. No new corrections at this time.
|
ESC13-00213
| General Inspection | 11/26/2013 | 11/27/2013 | 11/27/2013 2:07:22 PM | A | PASS |
|
|
WIP. Paving driveway so should reduce track out for rest of contractors. Hillside BMPs in place. No violations at this time.
|
ESC09-00352
| General Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 1:00:23 PM | | PASS |
|
|
No changes since prior inspection. BPR has closed its NOI on the Park construction; Brighton has NOI active for Walling Creek Corridor which is still in process of stabilization. CGP # IDR12BJ34
|
ESC13-00116
| Aging Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 12:43:57 PM | | PASS |
|
|
Finaled.
|
ESC13-00116
| DOC - Permit Finaled | 11/27/2013 | 11/27/2013 | 11/27/2013 12:43:34 PM | P | PASS |
|
|
Complete and stabilized. No further ESC inspections required. All other permits finaled.
|
ESC13-00283
| Aging Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 12:34:37 PM | | PASS |
|
|
No violations observed, BLD permit finaled, but the yard is not stabilized or landscaped so permit will remain open.
|
ESC13-01072
| Site Preparation | 11/26/2013 | 11/27/2013 | 11/27/2013 12:22:33 PM | P | FAIL |
|
|
Kristy Phone #: ###-####
Work started prior to site prep. Permit posted and BMPs installed but significant track out on Forked Deer and Epsilon.
Inspection hold until streets are adequately swept. Change DI filter bags that are greater than 50% full.
|
ESC13-00774
| Random Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 11:48:52 AM | P | FAIL |
|
|
Need to sweep up sidewalks and street in front of house.
Written CN left on site. Called RP Clint Wall to educate contractors to not drive over wattles.
|
ESC13-00773
| General Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 11:39:58 AM | | PASS |
|
|
No activity. BMPs installed, permit posted.
|
ESC13-00026
| Aging Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 11:37:06 AM | | PASS |
|
|
Finaled.
|
ESC13-00026
| DOC - Permit Finaled | 11/27/2013 | 11/27/2013 | 11/27/2013 11:36:51 AM | P | PASS |
|
|
House is complete and landscaped. All other permits finaled. ESC conditions have been met.
|
ESC13-00305
| Site Final | 11/26/2013 | 11/27/2013 | 11/27/2013 11:00:17 AM | A | NR |
|
|
Dan Phone #: ###-####.
Work is on-going. Trying to final ESC13-00309 at 3795, not 3779. RP stated crew will sweep up and remove construction materials, finish landscaping. Site final to re-scheduled.
|
ESC13-00130
| Aging Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 10:05:46 AM | | PASS |
|
|
Exterior work is complete, interior work remaining. Creek/canal is protected with vegetation and cement landscaping curb. No violations.
|
ESC13-00468
| Tracking Control | 11/27/2013 | 11/27/2013 | 11/27/2013 9:57:49 AM | A | FAIL |
|
|
Following corrections to be completed by end of day:
1. All streets in the Orchards swept. 2. Post permit signs in visible areas 3. Empty and re-install DI bags 4. Improve construction traffic control and parking. (no parking off pavement unless absolutely necessary)
If no action is taken, a SWO and hold on all inspections may be required.
|
ESC13-00566
| General Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 9:22:26 AM | | PASS |
|
|
Finaled.
|
ESC13-00566
| DOC - Permit Finaled | 11/27/2013 | 11/27/2013 | 11/27/2013 9:22:04 AM | P | PASS |
|
|
House is demolished. No materials left on site. Area has revegetated. No further ESC inspections required.
|
ESC13-00632
| General Inspection | 11/27/2013 | 11/27/2013 | 11/27/2013 9:03:36 AM | | PASS |
|
|
Finaled.
|
ESC13-00632
| DOC - Permit Finaled | 11/27/2013 | 11/27/2013 | 11/27/2013 9:03:15 AM | P | PASS |
|
|
No activity. Project appears complete, no outstanding ESC issues. No further ESC inspections required.
|