Inspections for the day of: Friday, November 27, 2015.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01532 Site Preparation11/27/201511/27/201511/27/2015 4:56:13 PMPCANC
ESC14-00135 General Inspection11/27/201511/27/201511/27/2015 3:44:54 PM CANC
ESC15-00509 General Inspection11/27/201511/27/201511/27/2015 3:44:48 PM CANC
ESC15-00360 General Inspection11/27/201511/27/201511/27/2015 3:44:42 PM CANC
ESC15-00737 Aging Inspection11/27/201511/27/201511/27/2015 1:31:37 PM PASS
No sediment leaving site. All permits finaled. Homeowner RP. Conditions satisfied.
ESC15-00737 DOC - Permit Finaled11/27/201511/27/201511/27/2015 1:31:03 PMPPASS
ESC14-01040 General Inspection11/27/201511/27/201511/27/2015 1:27:28 PM CANC
rescheduled for 12/1
ESC13-00755 General Inspection11/27/201511/27/201511/27/2015 12:02:53 PM CANC
No earth disturbing work at this time. Project scheduled to be completed by end of December. No inspection conducted at this time.
ESC15-00657 DOC - Permit Finaled11/27/201511/27/201511/27/2015 11:49:40 AMPPASS
ESC15-00303 DOC - Permit Finaled11/27/201511/27/201511/27/2015 11:10:55 AMPPASS
ESC15-00717 DOC - Permit Finaled11/27/201511/27/201511/27/2015 11:00:29 AMPPASS
ESC15-00391 General Inspection11/27/201511/27/201511/27/2015 10:48:51 AM PASS
WIP on one SFH in new Hickories development. All infrastructure is insatlled, no active subdivision work. Access is still restricted to the north to Fifeshire to stop trackout. No sediment runoff.

Designated lined concrete washout is installed, DIs have sediment bag protection. Culdesac and Farrow will need to be swept on next scheduled street sweeping. Approved.
ESC15-00105 DOC - Permit Finaled11/27/201511/27/201511/27/2015 8:27:43 AMPPASS
ESC15-00106 DOC - Permit Finaled11/27/201511/27/201511/27/2015 8:26:56 AMPPASS