Inspections for the day of: Tuesday, November 27, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04239 FIRE-Final Inspection11/27/201811/27/201811/27/2018 2:09:34 PMPFAIL
Called point of contact that was listed and left a voicemail with my contact info. Went to tenant space, space was unlocked but no city approved documents were on site.

Call for access- Danielle Phone #: ###-####
FIR18-00565 INSP-Sprinkler Rough-in11/26/201811/27/201811/27/2018 2:07:57 PMPFAIL
Correct overspaced attic heads as discussed. Insulation needs to be pulled tight and not hanging below deflectors is attic spaces. Make corrections to heads that are to close to deck, heads need to be 1 inch to 3 inches below the top cord per manufacture specs. Combustible concealed space under stairs that do not have insulation will need to have fire sprinkler protection added or cobustible material is covered with sheetrock or fill the space with non-combustible insulation.

Jonathon Phone #: ###-####
FIR18-00684 INSP-Sprinkler Rough-in11/26/201811/27/201811/27/2018 1:55:06 PMPPART
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with pink highlighter/red ink areas approved for cover.

Parcel cover north side of space. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00639 INSP-Final Inspection11/26/201811/27/201811/27/2018 10:58:00 AMAPASS
Previously noted items have been corrected, final fire sprinkler inspection complete.

Johnathon Phone #: ###-####
BLD18-01550 FIRE-Final Inspection11/27/201811/27/201811/27/2018 10:03:42 AMAPASS
Previously noted items for life fire safety inspection have been completed, final life fire safety inspection for area of work complete.
BLD18-01550 FIRE-Final Inspection11/26/201811/27/201811/27/2018 10:03:02 AMAPASS
Final fire sprinkler inspection for area of work complete.

Rick Phone #: ###-####
FIR18-00673 INSP-Sprinkler Rough-in11/26/201811/27/201811/27/2018 9:39:59 AMAPART
Rough to cover inspection for overhead fire sprinkler piping located in west wing complete (from fire doors west), area inspected approved for cover for both wet and dry system. Noted that hydrostatic tests can only be completed if the inside building temperature is maintained at 40 degrees or above with an un-interruptable heat source. If temperature cannot be maintained above 40 degress at all times then antifreeze will be required for hydros. If heat is shut off to building and the pipe is exposed to below 40 degrees after a hydro is completed then a new hydro will be required to verify intregrity of the system.

Phone #: ###-#### Inspection requested via web by Shane Lesteberg