BLD19-04340
| BLD-Framing/Rough-in | 11/26/2019 | 11/27/2019 | 11/27/2019 4:30:04 PM | P | PART |
|
|
Tom Phone #: ###-####//walls only//talked with Tom about fire sprinklers-advised to discuss with Troy//
|
BLD19-01789
| BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 4:29:04 PM | P | NR |
|
|
Vanessa Phone #: ###-####//need mechanical final and smoke , smoke carbon monoxide detectors in locations discussed//
|
BLD19-02871
| BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 3:06:06 PM | P | CANC |
|
|
Office number Phone #: ###-####//not ready//CN still poste//
|
BLD19-02650
| BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 2:27:06 PM | P | PASS |
|
|
Maureen Phone #: ###-####//no changes to existing//final complete//
|
BLD18-04229
| BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 1:39:08 PM | P | NR |
|
|
Robert Phone #: ###-####//exterior not complete//discussed with owner, he will call Jim who he has been working with on project//
|
BLD19-03934
| BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 12:31:28 PM | P | FAIL |
|
|
Brandy Phone #: ###-####//CN posted//need to add anchors on south end per engineering//
|
BLD19-02063
| BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 11:38:06 AM | P | FAIL |
|
|
Call for access to get inside the building- Chris Phone #: ###-####//foundation vents covered with plastic--needs to be open to underfloor//add insulation to crawl space hatch//provide blower door test and post results//
|
BLD19-03841
| BLD-Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 11:04:09 AM | A | PASS |
|
|
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//shear ok per plans//clarification for hold downs provided and stamped by design engineer//nailing ok//hold downs installed correctly//finish sheating at bottom of walls with same nailing patterns//
|
BLD19-03076
| BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 10:32:44 AM | A | PASS |
|
|
Natalie Phone #: ###-####//existing flashing used//no change in size//
|
BLD19-03076
| DOC - Permit Finaled | 11/27/2019 | 11/27/2019 | 11/27/2019 10:32:09 AM | P | PASS |
|
|
|
BLD19-03657
| BLD-Wall Bracing | 11/25/2019 | 11/27/2019 | 11/27/2019 10:17:00 AM | A | FAIL |
|
|
Mark Phone #: ###-####/need to add blocking on first story at all panel edges at shear locations(some vertical blocking will be needed)//Let GC know about eaves that will need to be 24 inches from PL//re-inspection required//
|
BLD19-03841
| BLD-Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 10:15:53 AM | A | CANC |
|
|
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### >> Inspection requested via web by Brad Pfannmuller Inspection cancelled from web by: Brad Pfannmuller
|
BLD16-02407
| BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 9:37:28 AM | A | PASS |
|
|
Joe Phone #: ###-####//added fire separation per Jim Sly at attic separation--ok//plans show exisitng door to remain-had them add self closing hinges//final complete per plans//
|
BLD16-02407
| DOC - Permit Finaled | 11/27/2019 | 11/27/2019 | 11/27/2019 9:37:03 AM | P | PASS |
|
|
|
BLD19-02713
| BLD-Final | 11/20/2019 | 11/27/2019 | 11/27/2019 9:16:33 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher//talked with contact, said footings were done with remodel,,will reschedule for Jim//
|
BLD19-03598
| BLD-Energy code compliance | 11/26/2019 | 11/27/2019 | 11/27/2019 9:04:52 AM | A | PASS |
|
|
Inspection in mudroom addition. Insulation R-20 spray in. Also please check framing in carport beam. OK to cover? Could we please get inspection before 9am? if not could inspector please call ###-#### Tara Thank you! Phone #: ###-#### Inspection requested via web by Tara Vreeland
|
BLD18-03079
| BLD-Aging Inspection | 11/27/2019 | 11/27/2019 | 11/27/2019 8:49:41 AM | | DONE |
|
|
Expires: 01/12/20
|