Inspections for the day of: Tuesday, November 28, 2000.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02401 BLD-Framing/Rough-in11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 08:54:57. Contact: ###-####.
BLD00-02401 BLD-Energy code compliance11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 08:55:42. Contact: ###-####.
MEC00-04097 Pressure Test11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 11:39:39. Contact: ###-####.
BLD00-02059 BLD-Final11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 16:17:56. Contact: ###-####.
BLD00-02036 BLD-Final11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 16:19:06. Contact: ###-####.
BLD00-01958 BLD-Final11/27/200011/28/200011/28/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 11/27/2000 at 16:20:08. Contact: ###-####.
BLD00-02665 BLD-Energy code compliance11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 17:25:17. Contact: .
MEC00-03415 Final11/27/200011/28/200011/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 12:58:02. Contact: ###-####. lock box code on the front door is JFC
BLD00-01930 BLD-Final11/27/200011/28/200011/28/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/27/2000 at 14:03:02. Contact: ###-####.
BLD00-02927 BLD-Framing/Rough-in11/27/200011/28/200011/28/2000 12:00:00 AMPPASS
SHEAR NAIL-- WALT ###-####
BLD99-02135 BLD-Final11/28/200011/28/200011/28/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/28/2000 at 10:14:41. Contact: ###-####. final only after plumbing is finaled 11/28/2000 5:58:12 PM
BLD00-02364 BLD-Framing/Rough-in11/28/200011/28/200011/28/2000 12:00:00 AMPPART
fr ron--- ###-####
MIS00-00244 BLD-Final11/27/200011/28/200011/28/2000 12:00:00 AMPPASS
KIWI---###-#### CALL 1ST BEFORE INSP--FN
BLD00-03452 BLD-Framing/Rough-in11/27/200011/28/200011/28/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 11/27/2000 at 12:45:18. Contact: ###-####.
BLD99-02372 BLD-Final11/27/200011/28/200011/28/2000 12:00:00 AMPFAIL
FN INSP--FOR HOMEOWNER- ANNE ###-#### WORK-- AFTER 12:30 IF POSSIBLE???? 11/28/2000 2:29:30 Pm garage has already been sided with out a shear nail inspection I talked to bob archibalb about this problem gave me severl options talked with anne she is going to add shear panels to inside of garage she also neede elec. final and add handrail to up stairs loft 11/30/2000 4:18:07 PM 11/30/2000 4:22:22 PM