BLD00-02401
| BLD-Framing/Rough-in | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 08:54:57. Contact: ###-####.
|
BLD00-02401
| BLD-Energy code compliance | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 08:55:42. Contact: ###-####.
|
MEC00-04097
| Pressure Test | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 11:39:39. Contact: ###-####.
|
BLD00-02059
| BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 16:17:56. Contact: ###-####.
|
BLD00-02036
| BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 16:19:06. Contact: ###-####.
|
BLD00-01958
| BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 16:20:08. Contact: ###-####.
|
BLD00-02665
| BLD-Energy code compliance | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 17:25:17. Contact: .
|
MEC00-03415
| Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 12:58:02. Contact: ###-####. lock box code on the front door is JFC
|
BLD00-01930
| BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 14:03:02. Contact: ###-####.
|
BLD00-02927
| BLD-Framing/Rough-in | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | P | PASS |
|
|
SHEAR NAIL-- WALT ###-####
|
BLD99-02135
| BLD-Final | 11/28/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 10:14:41. Contact: ###-####. final only after plumbing is finaled 11/28/2000 5:58:12 PM
|
BLD00-02364
| BLD-Framing/Rough-in | 11/28/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | P | PART |
|
|
fr ron--- ###-####
|
MIS00-00244
| BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | P | PASS |
|
|
KIWI---###-#### CALL 1ST BEFORE INSP--FN
|
BLD00-03452
| BLD-Framing/Rough-in | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 12:45:18. Contact: ###-####.
|
BLD99-02372
| BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 12:00:00 AM | P | FAIL |
|
|
FN INSP--FOR HOMEOWNER- ANNE ###-#### WORK-- AFTER 12:30 IF POSSIBLE???? 11/28/2000 2:29:30 Pm garage has already been sided with out a shear nail inspection I talked to bob archibalb about this problem gave me severl options talked with anne she is going to add shear panels to inside of garage she also neede elec. final and add handrail to up stairs loft 11/30/2000 4:18:07 PM 11/30/2000 4:22:22 PM
|