FIR05-00210
| INSP-Alarm Testing | 11/28/2005 | 11/28/2005 | 11/28/2005 4:59:24 PM | P | PASS |
|
|
c/n items are complete, fire alarm passed inspection.
|
FIR05-00404
| INSP-Sprinkler Rough-in | 11/28/2005 | 11/28/2005 | 11/28/2005 4:32:34 PM | P | CANC |
|
|
No time for this inspection today, to be completed tomorrow am.
|
BLD05-02968
| FIRE-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 4:16:57 PM | P | PASS |
|
|
The requested corrections have been made with regard to FD access, inspection passed.
|
FIR05-00599
| INSP-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 3:28:28 PM | P | PASS |
|
|
c/n items are finished, fire alarm permit finaled.
|
BLD05-01736
| FIRE-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 2:51:18 PM | P | NR |
|
|
Hood inspection needs to be completed and approved prior to final for fire life safety. Inspection rescheduled for tomorrow am after hood inspection is completed.
|
FIR05-00789
| INSP-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 2:48:29 PM | P | NR |
|
|
Hood inspection cannot be completed due to electrical issues per conversation with contractor, to be rescheduled for tomorrow am when ready.
|
FIR05-00718
| INSP-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 2:25:18 PM | P | PASS |
|
|
Fire sprinkler work is acceptable, permit finaled.
|
BLD05-00322
| FIRE-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 1:29:11 PM | P | PASS |
|
|
Items on correction notice have been resolved, life safety passed inspection.
|
BLD05-01364
| FIRE-Final Inspection | 11/23/2005 | 11/28/2005 | 11/28/2005 1:18:12 PM | A | PASS |
|
|
Life safety passed inspection, missing fire extinguisher to be installed this afternoon per Dale with Boise Schools facilities maintenance.
|
BLD05-02475
| FIRE-Final Inspection | 11/23/2005 | 11/28/2005 | 11/28/2005 12:44:03 PM | A | PART |
|
|
Fire life safety is acceptable, final pending shell permit finals.
|
FIR05-00742
| INSP-Final Inspection | 11/23/2005 | 11/28/2005 | 11/28/2005 12:41:08 PM | A | PART |
|
|
Final pending shell permit finals, two uprights at back hall are spaced too close.
|
BLD05-01831
| FIRE-Final Inspection | 11/23/2005 | 11/28/2005 | 11/28/2005 12:11:01 PM | A | FAIL |
|
|
Fire life safety items appear satisfactory, however, the related fire sprinker permit work must be inspected and approved prior to life safety final.
|
FIR04-00684
| INSP-Sprinkler Rough-in/Hydro | 11/28/2005 | 11/28/2005 | 11/28/2005 11:26:25 AM | A | PART |
|
|
Overhead rough-in at the basement confrence room is good for cover, one head at the NW corner is within 1' of a heat diffuser and a can light (may need an intermediate temp. head at this location).
|
BLD05-01119
| FIRE-Final Inspection | 11/23/2005 | 11/28/2005 | 11/28/2005 10:53:07 AM | A | PASS |
|
|
Fire life safety issues are satisfactory, c/n items have been completed, inspection passed.
|
BLD05-01849
| FIRE-Final Inspection | 11/25/2005 | 11/28/2005 | 11/28/2005 9:43:27 AM | A | PASS |
|
|
Fire life safety issues are satisfactory, inspection passed.
|
FIR05-00765
| INSP-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinkler finaled.
|
MIS05-00210
| FIR-Final | 11/28/2005 | 11/28/2005 | 11/28/2005 12:00:00 AM | P | PASS |
|
|
Life safety is satisfactory.
|