ESC05-00760
| Random Inspection | 11/28/2005 | 11/28/2005 | 11/29/2005 3:07:40 PM | P | PART |
|
|
Correction to rp
|
ESC04-00912
| Tracking Control | 11/28/2005 | 11/28/2005 | 11/28/2005 12:00:00 AM | P | PART |
|
|
Maintaince is needed on construction entrance, bare areas observed which will cause mud track out when rain/snow event takes place. Informed rp to address and all other constructions sites. Also informed rp to maintain all drop inlet protections.
|
ESC05-01473
| BMP Violation | 11/28/2005 | 11/28/2005 | 11/28/2005 12:00:00 AM | P | PASS |
|
|
Access controls behind sidewalk are in place, (fence). Continue to keep in place throughout construction project. Also, the construction entrance is installed. Maintain as needed. Sweep daily or as needed. Will follow up.
|
ESC04-00011
| Tracking Control | 11/28/2005 | 11/28/2005 | 11/28/2005 12:00:00 AM | P | PART |
|
|
Informed J. Snyder, (RP) via voice mail to call so I can inform him that provisions are needed from berm opening to lower retention pond which will reduce mud track out. Will follow up.
|