ELE06-03490
| Final | 11/28/2006 | 11/28/2006 | 11/28/2006 4:28:07 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 8:22:47 AM. called, left message to call, BCC 4-05-33(A)(B) all electrical equipment shall be listed by a nationally recognized testing laboratory (insta-hot), no card to sign , no number to call in notes
|
ELE06-03308
| Final | 11/28/2006 | 11/28/2006 | 11/28/2006 4:23:02 PM | P | PASS |
|
|
mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr made, ok to final
|
ELE06-03604
| Permanent Service | 11/28/2006 | 11/28/2006 | 11/28/2006 3:30:13 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: todd hall corrections made, p/s u/g n ok
|
ELE06-04394
| Electrical Rough-In | 11/28/2006 | 11/28/2006 | 11/28/2006 2:54:20 PM | P | PASS |
|
|
Trench inspection. Work performed by Dan Wooton.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz u/g ok to cover
|
ELE06-04370
| Final | 11/28/2006 | 11/28/2006 | 11/28/2006 2:33:17 PM | P | PASS |
|
|
donna ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith u/g ok, ok to final
|
ELE06-03344
| Electrical Rough-In | 11/28/2006 | 11/28/2006 | 11/28/2006 2:11:21 PM | P | PART |
|
|
steve - please call 1 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith rooms anop ok to cover
|
ELE06-03543
| Final | 11/28/2006 | 11/28/2006 | 11/28/2006 1:22:54 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 9:42:14 AM. Contact: ###-####. ok to final
|
ELE06-04374
| Conference | 11/27/2006 | 11/28/2006 | 11/28/2006 11:51:29 AM | A | DONE |
|
|
trevor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles talked about front 1/2 house and bring up to code, suggested read code book in addition to books he has, service may be ok, said to get bld permit and plumbing permit
|
ELE06-04356
| Final | 11/27/2006 | 11/28/2006 | 11/28/2006 10:11:11 AM | A | FAIL |
|
|
contact jack; Phone #: ###-#### Internet Inspection Request from: Emmet Bushman called left message, left corr notice, BCC job id sticker shall be posted, address shall be posted
|
ELE06-03722
| Final | 11/27/2006 | 11/28/2006 | 11/28/2006 9:26:18 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2006 at 3:58:08 PM. Contact: ###-####. talked to contr, ok to final
|
ELE06-03794
| Electrical Rough-In | 11/27/2006 | 11/28/2006 | 11/28/2006 9:11:52 AM | A | PASS |
|
|
###-#### - lee Note: quad 228 and 231 ric ok 228 and 231 only
|
ELE06-00113
| Electrical Rough-In | 11/27/2006 | 11/28/2006 | 11/28/2006 8:30:44 AM | A | PART |
|
|
###-#### - gregg - note: 4th floor garage ceiling and 1st floor remodel wall rough-in walls only ok to cover, dropped ceiling 4th floor anop ok to cover, told bldr to stop letting plumber do heat trace, need to see installation instructions, check loads and changes for heat trace.
|
ELE06-00113
| Electrical Rough-In | 11/27/2006 | 11/28/2006 | 11/27/2006 12:00:00 AM | A | CANC |
|
|
###-#### - gregg - note: 4th floor garage ceiling and 1st floor remodel wall rough-in
|