Inspections for the day of: Tuesday, November 28, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00171 FIR-Aging Inspection11/28/200611/28/200612/5/2006 3:07:41 PM DONE
wip
BLD06-00496 FIRE-Final Inspection11/27/200611/28/200611/28/2006 4:26:31 PMAPASS
Life safety inspection completed satisfactory.
BLD06-00495 FIRE-Final Inspection11/27/200611/28/200611/28/2006 4:25:37 PMAPASS
Final fire life safety inspection passed.
BLD06-00497 FIRE-Final Inspection11/27/200611/28/200611/28/2006 4:24:10 PMAPASS
Fire life safety inspection passed.
FIR06-00423 INSP-Final Inspection11/28/200611/28/200611/28/2006 4:23:08 PMPPASS
Fire sprinkler permit finaled.
FIR06-00644 INSP-Final Inspection11/28/200611/28/200611/28/2006 4:22:43 PMPFAIL
The hood suppression system is required to be interconnected with the existing building fire alarm system, also need to provide separation method between the fryer and the adjacent griddle.
FIR06-00313 INSP-Final Inspection11/27/200611/28/200611/28/2006 4:19:55 PMAPASS
Fire alarm inspection passed, permit finaled.
FIR06-00311 INSP-Final Inspection11/27/200611/28/200611/28/2006 4:19:30 PMAPASS
Fire alarm inspection passed, permit finaled.
FIR06-00310 INSP-Final Inspection11/27/200611/28/200611/28/2006 4:18:57 PMAPASS
Fire alarm inspection passed.
BLD06-01678 FIRE-Final Inspection11/28/200611/28/200611/28/2006 2:23:18 PMAFAIL
Need approved door hardware at the server room and vault, also need to re-install door closures at the elevator lobby doors.
FIR06-00805 INSP-Final Inspection11/27/200611/28/200611/28/2006 2:20:26 PMAPASS
Fire alarm inspection passed, permit finaled.
FIR05-00425 INSP-Sprinkler Rough-in11/27/200611/28/200611/28/2006 11:52:01 AMAFAIL
Inspection for the 4th floor drop ceiling-heads are overspaced at locations as marked on approved plans, heads at two locations are not installed, heads are shadowed by structural beams which are not indicated on plan set and create obstruction issues.
FIR06-00639 INSP-Sprinkler Rough-in11/27/200611/28/200611/28/2006 11:45:39 AMAPART
Corrections for the 2nd floor rough-in are complete, overhead sprinkler is approved for cover.
FIR06-00734 INSP-Final Inspection11/27/200611/28/200611/28/2006 11:44:03 AMAPASS
Fire sprinkler permit finaled, final inspection passed.
FIR06-00713 INSP-Final Inspection11/27/200611/28/200611/28/2006 11:43:14 AMAFAIL
Missing retaining straps at beam clamps, beam clamps are not approved to be attatched to pan decking, existing heads above the new drop ceiling shall be removed, one upright at the open area does not match the temp. rating of the adjacent heads, pendent in the break room is off axis.