BLD06-02282
| FIRE-Final Inspection | 11/28/2006 | 11/28/2006 | 11/28/2006 4:46:42 PM | P | FAIL |
|
|
Provide tag for the fire extinguisher and the correct sticker as discussed for the main exit door.
|
FIR06-00824
| INSP-Sprinkler Rough-in/Hydro | 11/28/2006 | 11/28/2006 | 11/28/2006 4:45:37 PM | P | PASS |
|
|
The 24 hour air test began at 12:30 with the guage reading 43 psi
|
FIR06-00740
| INSP-Final Inspection | 11/28/2006 | 11/28/2006 | 11/28/2006 3:15:43 PM | P | PASS |
|
|
permit finaled
|
FIR06-00543
| INSP-Sprinkler Rough-in/Hydro | 11/27/2006 | 11/28/2006 | 11/28/2006 3:10:02 PM | P | FAIL |
|
|
Before I give the ok to cover the sprinkler piping associated with this scope of work the shell/core piping needs to be inspected and passed. These inspections have not been called in and the plans were not on the job site.
|
FIR06-00914
| INSP-Final Inspection | 11/27/2006 | 11/28/2006 | 11/28/2006 3:00:44 PM | A | PASS |
|
|
Permit finaled. Todd is contacting the property manager about providing the knox box
|
BLD06-00658
| FIRE-Final Inspection | 11/28/2006 | 11/28/2006 | 11/28/2006 1:46:28 PM | P | PASS |
|
|
life safety finaled
|
FIR05-00536
| INSP-Sprinkler Rough-in | 11/28/2006 | 11/28/2006 | 11/28/2006 12:58:57 PM | P | PASS |
|
|
See city approved plans for locations on 4th floor where piping is ok to cover in the hardlid areas.
|
FIR05-00827
| INSP-Sprinkler Rough-in | 11/28/2006 | 11/28/2006 | 11/28/2006 12:58:19 PM | P | PASS |
|
|
Sprinkler piping ok to cover
|
BLD06-02084
| FIRE-Final Inspection | 11/27/2006 | 11/28/2006 | 11/28/2006 12:45:24 PM | A | FAIL |
|
|
No approved plans on site for inspection
|
FIR06-00847
| INSP-Final Inspection | 11/27/2006 | 11/28/2006 | 11/28/2006 9:50:18 AM | A | PASS |
|
|
permit finaled
|