FIR11-00626
| INSP-Sprinkler Rough-in | 11/28/2011 | 11/28/2011 | 11/28/2011 3:11:48 PM | P | PASS |
|
|
The spinkler piping above the restroom hardlid is ok to cover.
|
FIR11-00464
| INSP-Sprinkler Rough-in/Hydro | 11/28/2011 | 11/28/2011 | 11/28/2011 3:05:44 PM | P | FAIL |
|
|
I witnessed the overhead hydro test twice but it failed both times.
|
FIR11-00479
| INSP-Sprinkler Rough-in | 11/23/2011 | 11/28/2011 | 11/28/2011 2:39:56 PM | P | FAIL |
|
|
No city approved plans on site. The general contractor and I noted overspaced upright coverage along the east wall and in the riser room.
|
BLD11-00693
| FIRE-Final Inspection | 11/22/2011 | 11/28/2011 | 11/28/2011 11:01:27 AM | A | FAIL |
|
|
Provide exit signs and emergency lighting as shown on the city approved plans.
|
FIR11-00606
| INSP-Final Inspection | 11/23/2011 | 11/28/2011 | 11/28/2011 8:12:16 AM | A | PASS |
|
|
permit finaled
|