FIR14-00735
| INSP-Sprinkler Rough-in | 11/24/2014 | 11/25/2014 | | A | |
|
|
RTC for Dry System, Bldg D 1st floor, please call Scott 30 minutes prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
FIR14-00708
| INSP-Sprinkler Rough-in | 11/26/2014 | 11/26/2014 | | P | |
|
|
Matt Phone #: ###-####
|
FIR14-00531
| INSP-Conference | 11/26/2014 | 11/26/2014 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR14-00840
| INSP-Sprinkler Rough-in | 11/28/2014 | 11/28/2014 | 11/28/2014 4:32:49 PM | P | PART |
|
|
OH rough-in inspection completed satisfactory.
|
BLD14-03388
| FIRE-Final Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 1:32:40 PM | P | PASS |
|
|
Life safety approved pending "door to remain...." signage is posted at the main entry/exit. To be completed prior to structural final as discussed with Linda.
|
BLD14-02862
| FIRE-Final Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 1:30:52 PM | P | FAIL |
|
|
Project is not in condition for final approval at this time. Noted several items including; missing panic hardware at the meeting room exit doors per plan, post max. occupant signage, provide second exit sign/EM light at the meeting room per plan, missing ceiling tile throughout, provide approved hardware at the restroom door, repair exit discharge light at the alley way, missing hardware at the second exit from meeting room, post fire extinguishers per plan, project related fire sprinkler permit is not yet finaled, remove non-applicable suite address numbers, blank or disable keyed deadbolt above panic hardware main entry/exit.
|
BLD13-02118
| FIRE-Final Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 11:42:55 AM | A | PASS |
|
|
Verified C/N items. Fire life safety finaled.
|
BLD14-01045
| FIRE-Final Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 10:47:30 AM | A | PASS |
|
|
Fire life safety inspection passed provided door hardware at the SW exit is reversed to allow free egress as discussed- to be finished prior to structural final for verification at that time.
|
BLD14-01339
| FIRE-Final Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 10:27:38 AM | A | NR |
|
|
Inspection request intended for Monday 12/1 AM per conversation with the contractor. -Rescheduled per discussion
|