BLD17-02106
| BLD-Foundation | 11/21/2017 | 11/22/2017 | | P | |
|
|
wall // brandon Phone #: ###-####
|
BLD17-01265
| BLD-Concrete | 11/27/2017 | 11/28/2017 | 12/5/2017 7:25:28 AM | A | DONE |
|
|
rebar- Brad Phone #: ###-####
|
BLD17-01266
| BLD-Other | 11/20/2017 | 11/28/2017 | 11/29/2017 7:51:52 AM | A | DONE |
|
|
Check status of work? no work done
|
BLD17-00583
| BLD-Other | 11/28/2017 | 11/28/2017 | 11/29/2017 7:22:17 AM | A | PASS |
|
|
Fire caulking inspection on 2nd floor east wing that we started yesterday to allow insulation throughout and drywall band on exterior walls. Phone #: ###-#### Inspection requested via web by David Banks
|
BLD17-02937
| BLD-Footing | 11/27/2017 | 11/28/2017 | 11/28/2017 4:08:49 PM | P | PASS |
|
|
Call 20 mins before // Drew Phone #: ###-####
|
BLD17-02937
| BLD-Wall Bracing | 11/27/2017 | 11/28/2017 | 11/28/2017 4:08:33 PM | P | PASS |
|
|
Call 20 mins before // Drew Phone #: ###-####
|
MIS17-00404
| BLD-Conference | 11/28/2017 | 11/28/2017 | 11/28/2017 4:05:27 PM | P | PASS |
|
|
Possible work without permits in back stop work issued
|
BLD17-03914
| BLD-Final | 11/27/2017 | 11/28/2017 | 11/28/2017 1:49:33 PM | P | PASS |
|
|
Marva Phone #: ###-####
|
BLD17-04034
| BLD-Final | 11/27/2017 | 11/28/2017 | 11/28/2017 10:23:42 AM | A | PASS |
|
|
Mike Phone #: ###-####
|
BLD17-04034
| DOC - Permit Finaled | 11/28/2017 | 11/28/2017 | 11/28/2017 10:23:30 AM | P | PASS |
|
|
|
BLD17-03703
| BLD-Wall Bracing | 11/27/2017 | 11/28/2017 | 11/28/2017 10:23:16 AM | A | PASS |
|
|
Nick Phone #: ###-####
|