Inspections for the day of: Wednesday, November 29, 2000.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02896 BLD-Final11/28/200011/29/200011/29/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/28/2000 at 13:15:33. Contact: ###-####. card on site good for l/c final ok. 11/29/2000 10:49:19 AM
BLD00-01563 BLD-Foundation11/27/200011/29/200011/29/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/27/2000 at 09:00:56. Contact: ###-####. p/w/s/i. walk through waffel slab beingstriped looks very good. 11/29/2000 12:52:06 PM
BLD00-01563 BLD-Foundation11/27/200011/29/200011/29/2000 12:00:00 AMAPART
joe-- ###-#### found--tressel.north cassion drilled pending s/i report. 11/29/2000 1:48:57 PM
MEC00-03799 Rough-in11/28/200011/29/200011/29/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/28/2000 at 11:51:13. Contact: ###-####.
BLD00-01563 BLD-Concrete11/27/200011/29/200011/29/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/27/2000 at 07:04:49. Contact: ###-####.
BLD00-02656 BLD-Framing/Rough-in11/28/200011/29/200011/29/2000 12:00:00 AMPPART
###-#### CALL FIRSTneed truss engineering to verify lateral bracing at final. 11/29/2000 3:24:25 PM
BLD00-01471 BLD-Final11/29/200011/29/200011/29/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 11/29/2000 at 07:54:19. Contact: ###-####.
BLD00-02707 BLD-Framing/Rough-in11/29/200011/29/200011/29/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/29/2000 at 10:48:04. Contact: ###-####. exterior sheer pannels ok for cover. 11/29/2000 2:25:51 PM