BLD00-02896
| BLD-Final | 11/28/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 13:15:33. Contact: ###-####. card on site good for l/c final ok. 11/29/2000 10:49:19 AM
|
BLD00-01563
| BLD-Foundation | 11/27/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 09:00:56. Contact: ###-####. p/w/s/i. walk through waffel slab beingstriped looks very good. 11/29/2000 12:52:06 PM
|
BLD00-01563
| BLD-Foundation | 11/27/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | A | PART |
|
|
joe-- ###-#### found--tressel.north cassion drilled pending s/i report. 11/29/2000 1:48:57 PM
|
MEC00-03799
| Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 11:51:13. Contact: ###-####.
|
BLD00-01563
| BLD-Concrete | 11/27/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 07:04:49. Contact: ###-####.
|
BLD00-02656
| BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | P | PART |
|
|
###-#### CALL FIRSTneed truss engineering to verify lateral bracing at final. 11/29/2000 3:24:25 PM
|
BLD00-01471
| BLD-Final | 11/29/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 07:54:19. Contact: ###-####.
|
BLD00-02707
| BLD-Framing/Rough-in | 11/29/2000 | 11/29/2000 | 11/29/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 10:48:04. Contact: ###-####. exterior sheer pannels ok for cover. 11/29/2000 2:25:51 PM
|