Inspections for the day of: Wednesday, November 29, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02347 BLD-Framing/Rough-in11/28/200011/29/200011/29/2000 12:00:00 AMANR
joe ###-#### rebar not a frame 11/29/2000 12:36:35 PM
MIS00-00167 BLD-Conference11/29/200011/29/200011/29/2000 12:00:00 AMAPART
Added by Inspector: 340 On 11/29/2000 9:08:54 AM w/ 406 re insps status
BLD00-02981 BLD-Conference11/29/200011/29/200011/29/2000 12:00:00 AMAPART
Added by Inspector: 340 On 11/29/2000 9:27:22 AM referred to 407
BLD00-02952 BLD-Final11/29/200011/29/200011/29/2000 12:00:00 AMAPASS
Added by Inspector: 340 On 11/29/2000 9:31:51 AM l/c only
BLD99-02816 BLD-Conference11/29/200011/29/200011/29/2000 12:00:00 AMAPASS
Added by Inspector: 340 On 11/29/2000 11:38:38 AM w/305r re stair
BLD00-02347 BLD-Concrete11/29/200011/29/200011/29/2000 12:00:00 AMPPART
Added by Inspector: 340 On 11/29/2000 12:37:28 PM ftgs, pend soils report (MTI?)
BLD00-02791 BLD-Conference11/29/200011/29/200011/29/2000 12:00:00 AMPPASS
Added by Inspector: 340 On 11/29/2000 3:30:39 PM need complete struct work at door
BLD00-02119 BLD-Final11/29/200011/29/200011/29/2000 12:00:00 AMPPASS
###-####,lc issued 11/29/2000 5:12:47 PM
BLD00-02682 BLD-Footing11/29/200011/29/200011/29/2000 12:00:00 AMPPART
ft insp --###-####- benny, appears ok, rebar in 11/29/2000 4:24:30 PM
BLD00-02774 BLD-Framing/Rough-in11/28/200011/29/200011/29/2000 12:00:00 AMPPART
###-#### walls ok pending hvac ok 11/29/2000 3:31:25 PM
BLD00-01913 BLD-Final11/28/200011/29/200011/29/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/28/2000 at 11:09:26. Contact: ###-####. ###-#### 11/29/2000 9:52:43 AM c/n, firestops, remove chase at duct. 11/29/2000 3:02:04 PM
MIS00-00283 BLD-Conference11/28/200011/29/200011/29/2000 12:00:00 AMPPASS
###-#### call first 20 minutes prior...c/n issued for plan check...add headers, replace charred framing...stairs, egress windows at bsmt??? 11/29/2000 4:19:47 PM