ELE01-02484
| ELE-Aging Inspection | 11/29/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | | NR |
|
|
no recent inspections requested. 11/29/2001 9:08:49 AM
|
ELE01-00851
| Permanent Service | 11/28/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | A | PASS |
|
|
###-####. main service switch-gear.
p/s ug n mtn. power ele #0851-ok. 11/29/2001 9:09:56 AM
|
ELE01-03933
| Final | 11/28/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | A | NR |
|
|
###-####. contractor will reschedule when accessible. 11/29/2001 11:03:49 AM
|
ELE01-01431
| Electrical Rough-In | 11/28/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | A | PASS |
|
|
alan ###-####. direct-burial cable in trench for site-lighting ok. 11/28/2001 1:54:15 PM
|
ELE01-03804
| Final | 11/28/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | A | FAIL |
|
|
andy ###-####. 210-8. kitchen small appliance branch circuit shall have gfci protection, (gfci recep. in-operative). called contractor. 11/29/2001 9:37:25 AM
|
ELE01-03670
| Final | 11/28/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 17:01:07. Contact: ###-####. temporary occupancy. 11/29/2001 11:04:46 AM
|
ELE01-03810
| Electrical Rough-In | 11/29/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | P | PASS |
|
|
###-#### gary 11/29/2001 1:33:43 PM
ele r/i;service panel. bake-shop in back. 11/29/2001 3:13:18 PM
|
ELE01-04025
| Rough-In Permanent Service | 11/29/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | P | CANC |
|
|
###-#### will reschedule. 11/29/2001 3:28:23 PM
|
ELE01-04031
| Temporary Service | 11/29/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | P | PASS |
|
|
KEVIN ###-####. temporary service pole.
t/s oh rick's ele #4031-ok 11/29/2001 2:51:40 PM
|
ELE01-03526
| Electrical Rough-In | 11/29/2001 | 11/29/2001 | 11/29/2001 12:00:00 AM | P | PASS |
|
|
potting & partial underground --kathy ###-####
ok. 11/29/2001 1:33:52 PM
|