PLM02-00553
| Final | 11/27/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 14:55:16. Contact: ###-####. final ok 11/29/2002 9:12:36 AM
|
PLM02-03316
| Plumbing Rough-in | 11/29/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | P | PART |
|
|
###-#### ok to cover bathroom walls with abandonded lav waste capped, will see lav tie in in crawlspace later. 11/29/2002 2:58:58 PM
|
PLM02-03626
| Plumbing Rough-in | 11/29/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | P | FAIL |
|
|
###-#### waste and vent test ok but needs to run 1 1/4" thru water sftenor 11/29/2002 12:06:02 PM
|