BLD02-02098
| BLD-Framing/Rough-in | 11/19/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | A | FAIL |
|
|
###-#### Gary Phillips Shear--C/n posted on site and telephoned gary of what is needed. Do not cover. 11/29/2002 8:57:14 AM
|
BLD02-02301
| BLD-Framing/Rough-in | 11/27/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 12:14:07. Contact: ###-####.
|
MIS02-00309
| BLD-Final | 11/27/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | A | PASS |
|
|
BRAD; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
MIS02-00295
| BLD-Final | 11/27/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | A | NR |
|
|
###-#### dan Required signatures needed prior to building final. Contacted owner and informed him what is required. 11/29/2002 8:56:13 AM
|
BLD02-02802
| BLD-Other | 11/27/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 17:16:31. Contact: ###-####. Re-roof--appears ok. 11/29/2002 9:07:01 AM
|
BLD02-02849
| BLD-Foundation | 11/29/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/29/2002 at 10:21:14. Contact: ###-####.
|
BLD02-01699
| BLD-Framing/Rough-in | 11/27/2002 | 11/29/2002 | 11/29/2002 12:00:00 AM | P | FAIL |
|
|
###-####C/N issued--Need electrical r. in and foam seal before ok to insulate can be granted. Recall 11/29/2002 1:45:22 PM
|