BLD04-01255
| BLD-Final | 11/22/2004 | 11/23/2004 | | A | |
|
|
Internet Inspection Request from: Wayne Berry
|
MEC04-03354
| Rough-in | 11/24/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/24/2004 at 2:22:35 PM. Contact: ###-####. duct foint sealant in place ok to start insulation on 6 th floor. 11/29/2004 9:46:35 AM
|
BLD04-02374
| BLD-Final | 11/26/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | A | NR |
|
|
David call before you go out; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD04-02412
| BLD-Foundation | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:18:54 AM. Contact: ###-####.
|
BLD04-02473
| BLD-Foundation | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:19:41 AM. Contact: ###-####.
|
BLD04-02469
| BLD-Foundation | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:20:25 AM. Contact: ###-####.
|
MEC04-03369
| Pressure Test | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | PASS |
|
|
russ ###-#### 60 # test 11/29/2004 2:44:26 PM
|
MEC04-03369
| Rough-in | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | FAIL |
|
|
russ ###-#### gas line listed protection./seal return air jiost bay. 11/29/2004 2:45:13 PM
|