FIR04-00575
| INSP-Final Inspection | 11/22/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | A | FAIL |
|
|
Rick, We would like to request meeting at the Hoff building at 9:00am if possible. Please advise us if there is a better time for you. You can reach me here at the office, or on my cell phone at ###-#### as needed. Thank you. Jason; Phone #: ###-#### Internet Inspection Request from: Jason Minnick FACP panel displat not operating; voice page does not tell occupants to exit but to wait at corridors; initiating devices don't match plan addresses; all page microphone not working; BPS one-line diagrams don't match actual wiring; need updated maps 11/29/2004 11:41:38 AM
|
BLD04-01253
| FIRE-Final Inspection | 11/24/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | A | PASS |
|
|
Fire/life safety final okay 11/29/2004 11:20:24 AM
|
FIR04-00332
| INSP-Sprinkler Rough-in/Hydro | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 9:37:31 AM. Contact: ###-####. There is lack of coverage between the glass and the fire shutter at the service counter - the space is 1.5 ft by 15 ft. 11/29/2004 3:46:29 PM
|
BLD04-00029
| FIRE-Final Inspection | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 9:45:52 AM. Contact: ###-####. Phased project - okay on the 18th floor only 11/29/2004 3:51:18 PM
|
FIR04-00591
| INSP-Final Inspection | 11/29/2004 | 11/29/2004 | 11/29/2004 12:00:00 AM | P | PASS |
|
|
|