ELE07-02777
| Final | 11/28/2007 | 11/29/2007 | 11/29/2007 5:20:01 PM | P | PASS |
|
|
RENEA Phone #: ###-#### . 1. final ok. .
|
ELE07-01575
| Electrical Rough-In | 11/29/2007 | 11/29/2007 | 11/29/2007 3:46:00 PM | P | PASS |
|
|
jerod Note: bonding grid spa - call 10 min prior to explain Phone #: ###-#### . 1. grid ok. .
|
ELE07-03958
| Electrical Rough-In | 11/29/2007 | 11/29/2007 | 11/29/2007 2:34:48 PM | P | PART |
|
|
rocky Note: ok to cover - Phone #: ###-#### . 1. no service at this time. . . 2. ri for addition only ok for cover. .
|
ELE07-03954
| Temporary Service | 11/29/2007 | 11/29/2007 | 11/29/2007 1:38:18 PM | P | PASS |
|
|
spencer Phone #: ###-#### . 1. t/s o/h n ok. .
|
ELE07-03951
| Electrical Rough-In | 11/29/2007 | 11/29/2007 | 11/29/2007 1:08:24 PM | P | PART |
|
|
Cover inspection for addition in rear of home. Enter home from street side. Builder will be on site. Addition of bedroom, bathroom, utility area with stacked washer and dryer, and hallway. Phone #: ###-#### Internet Inspection Request from: Joe Thomas . 1. ri for back bdrm and bathrm only ok. .
|
ELE07-03912
| Final | 11/28/2007 | 11/29/2007 | 11/29/2007 1:00:28 PM | P | PASS |
|
|
electrician is Tom Wonacott. Request that inspector be there @ 2pm, Idaho Power will be there at 3pm Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer . 1. final ok. .
|
ELE07-03951
| Rough-In Permanent Service | 11/29/2007 | 11/29/2007 | 11/29/2007 1:00:05 PM | P | PASS |
|
|
Cover inspection for addition in rear of home. Enter home from street side. Builder will be on site. Addition of bedroom, bathroom, utility area with stacked washer and dryer, and hallway. Phone #: ###-#### Internet Inspection Request from: Joe Thomas . 1. p/s u/g reconnect ok. .
|
ELE07-03546
| Final | 11/28/2007 | 11/29/2007 | 11/29/2007 12:11:22 PM | A | PASS |
|
|
steve - first thing in the morning per bill Phone #: ###-#### or ###-#### . 1. final ok. .
|
ELE06-00683
| Final | 11/28/2007 | 11/29/2007 | 11/29/2007 10:50:42 AM | A | CANC |
|
|
I hooked up an A/C unit, there should have only been 1 inspection because I was all done at that point. There is no rough in on this type of job. Phone #: ###-#### Internet Inspection Request from: Andy Derrick . 1. final ok. .
|
ELE07-03478
| Electrical Rough-In | 11/28/2007 | 11/29/2007 | 11/29/2007 10:35:13 AM | A | PART |
|
|
For questions pls call Randy w/Doherty @ ###-####. Scheduled by Heather w/Doherty. Phone #: ###-#### Internet Inspection Request from: Heather Packer . 1. as noted on print ok for cover. .
|
ELE07-00725
| Final | 11/28/2007 | 11/29/2007 | 11/29/2007 10:17:34 AM | A | PASS |
|
|
Final Inspections please call Eddy @ ###-#### with any questions. Phone #: ###-#### Internet Inspection Request from: Beka Hereau
|