ESC13-00309
| Site Final | 11/27/2013 | 11/29/2013 | 11/29/2013 11:48:05 AM | A | PASS |
|
|
RP Dan ####-####
Finaled. See activity notes.
|
ESC13-00309
| DOC - Permit Finaled | 11/29/2013 | 11/29/2013 | 11/29/2013 11:47:29 AM | P | PASS |
|
|
Sidewalk and street area in front of townhouse have been swept. DI bags have been replaced to keep protection for projects on adjacent lots per agreement with RP Dan. ESC conditions satisfied.
|
ESC13-00445
| Aging Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 11:26:32 AM | | PASS |
|
|
Finaled.
|
ESC13-00445
| DOC - Permit Finaled | 11/29/2013 | 11/29/2013 | 11/29/2013 11:26:11 AM | P | PASS |
|
|
Garage project is complete. Yard is stabilized. No construction materials or stockpiles on site. Permits are finaled.
|
ESC13-00329
| Aging Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 11:08:54 AM | | PASS |
|
|
Finaled.
|
ESC13-00329
| DOC - Permit Finaled | 11/29/2013 | 11/29/2013 | 11/29/2013 11:07:58 AM | P | PASS |
|
|
House complete and landscaped/stabilized. Permits finaled, house occupied. ESC conditions met.
|
ESC13-01004
| Site Preparation | 11/27/2013 | 11/29/2013 | 11/29/2013 10:58:09 AM | A | FAIL |
|
|
Clint Phone #: ###-####
Concrete washout is full on block. Needs to be emptied, no more capacity. Alley and surrounding streets have trackout and dirt clods. Need to cleanup prior and implement/maintain BMPs to improve conditions at the Tahoe Home sites on this block of Old Hickory and Honeycomb.
|
ESC13-00232
| Random Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 10:43:55 AM | P | FAIL |
|
|
Trackout observed on sidewalk, Mesa Verde, and small portion of Rhyolite.
Written correction posted at site.
1. Sweep up all trackout in front of site. 2. Provide construction entrance or prohibit parking/driving on the dirt.
Second issue at this site, may require further escalation.
|
ESC13-00299
| General Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 10:32:50 AM | | PASS |
|
|
Finaled. See activity notes.
|
ESC13-00299
| DOC - Permit Finaled | 11/29/2013 | 11/29/2013 | 11/29/2013 10:30:59 AM | P | PASS |
|
|
Grass has taken root and landscaping complete. All permits finaled, house is occupied. ESC conditions satisfied.
|
ESC13-00920
| General Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 10:22:22 AM | | PASS |
|
|
BMPs installed and permit posted visibly. No corrections at this. Most exterior and concrete work is complete.
|
ESC13-00918
| General Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 9:45:46 AM | | PASS |
|
|
Stockpile is still on site. The entire site (518-526) is surrounded by silt fence, which is in good condition. No trackout, but construction entrance may require more rock when conditions get wet.
|
ESC13-00895
| General Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 9:15:53 AM | | PASS |
|
|
Interior work on 3rd floor in progress. Dumpster for materials on site and clean. Filter bag protection on on-site DI.
|
ESC13-00044
| General Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 9:01:04 AM | | PASS |
|
|
|