BLD16-01381
| FIRE-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 3:03:47 PM | A | PASS |
|
|
life safety passed
|
FIR16-00364
| INSP-Final Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 3:00:27 PM | P | CANC |
|
|
Rescheduled for tomorrow as previously discussed. calvin Phone #: ###-####
|
BLD16-02213
| FIRE-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 2:45:46 PM | P | FAIL |
|
|
Provide sprinkler modifications or baffle as discussed, provide documentation that the emergency light in the kitchen can be deleted. Exit discharge lights repaired as I waited.
|
BLD16-03872
| FIRE-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 2:43:32 PM | A | PASS |
|
|
Life safety passed. TVFP is going to do the annual inspection
|
FIR16-00540
| INSP-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 2:40:47 PM | P | CANC |
|
|
Robert Phone #: ###-####
|
BLD16-00731
| FIRE-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 2:40:31 PM | P | PASS |
|
|
Life safety passed
|
FIR16-00435
| INSP-Final Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 2:39:51 PM | P | PASS |
|
|
Permit finaled
|
BLD16-03620
| FIRE-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 10:42:57 AM | A | PASS |
|
|
Life safety passed
|
FIR16-00284
| INSP-Sprinkler Rough-in | 11/28/2016 | 11/29/2016 | 11/29/2016 10:08:26 AM | A | PART |
|
|
Two of the north side, second floor apartments are ok to cover the other two need tenting corrected. Also the north end east side stairwell piping has not been tented yet. See the city approved plans for locations marked.
|
FIR16-00540
| INSP-Sprinkler Rough-in | 11/28/2016 | 11/29/2016 | 11/29/2016 9:21:24 AM | A | FAIL |
|
|
Two pendants need to be added in the Bakery Area. Fire dept needs to approve the location/blockage of the FDC.
|
FIR16-00540
| INSP-Sprinkler Rough-in/Hydro | 11/28/2016 | 11/29/2016 | 11/29/2016 9:20:34 AM | A | FAIL |
|
|
Can not due hydro because of the two heads that need to be added in the Bakery Area.
|
FIR16-00364
| INSP-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 9:19:35 AM | A | PART |
|
|
Sprinkler work complete in apartments 101, 102, 201, 202, 301, 302.
|
BLD14-03070
| FIRE-Final Inspection | 11/23/2016 | 11/29/2016 | 11/29/2016 9:18:49 AM | A | PART |
|
|
Life safety passed only for apartments 101, 102, 201, 202, 301, 302.
|
FIR16-00254
| INSP-Final Inspection | 11/23/2016 | 11/29/2016 | 11/29/2016 9:17:55 AM | A | PASS |
|
|
Permit finaled
|