Inspections for the day of: Thursday, November 29, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-01998 ELE-Aging Inspection11/29/201811/29/201812/6/2018 11:04:05 AM CANC
Company out of business
ELE13-01672 ELE-Aging Inspection11/29/201811/29/201812/6/2018 9:39:18 AM DONE
Waiting on owner
MIS18-00445 ELE-Conference11/29/201811/29/201811/29/2018 5:52:16 PMPDONE
Contractor from Jennco will pull permit and remove sheetrock as needed for buried electrical in detached building. No BLD needed as it is less then 200 sq feet, maybe a Mech if as heatig unit is installed
ELE18-04568 Final11/29/201811/29/201811/29/2018 1:37:05 PMPPASS
Phone #: ###-#### Inspection requested via web by Matthew White
Final ok
ELE18-04338 Final11/29/201811/29/201811/29/2018 1:36:19 PMPPASS
Damion Phone #: ###-####
Final for service change ok
ELE18-04198 Final11/29/201811/29/201811/29/2018 12:59:42 PMPPASS
Marcos-(M H Owner) Phone #: ###-####
Final ok
ELE18-03934 Final11/29/201811/29/201811/29/2018 12:59:26 PMPPASS
Marcos-(M H Owner) Phone #: ###-####
Final ok
ELE18-04244 Electrical Rough-In11/26/201811/29/201811/29/2018 12:04:24 PMPPASS
Please call Brian, the foreman on site, when you are on your way. He can be reached at ###-####. Phone #: ###-#### Inspection requested via web by Ashley White
Verified U/L listing of Solar array system and scope of work, OK to proceed
ELE18-04410 Final11/28/201811/29/201811/29/2018 12:03:39 PMAPASS
Solar light poles have been installed and working. No street power has been ran into the poles, purely solar powered. Phone #: ###-#### Inspection requested via web by Jim Noll
Final ok
ELE18-04327 Final11/29/201811/29/201811/29/2018 10:15:52 AMPPASS
Final for Solar Array ok
ELE18-04553 Final11/28/201811/29/201811/29/2018 10:14:33 AMAPASS
GARAGE CODE IS 9604 Phone #: ###-#### Inspection requested via web by Gene Wright
Final for well pump ok
ELE18-04399 Final11/28/201811/29/201811/29/2018 10:14:02 AMAPASS
Old Dominion Solar''s inspection has also been scheduled at the same time.

Thank you ; have a great day! Phone #: ###-#### Inspection requested via web by JENNY EMEL
Final for solar array ok
ELE18-04493 Electrical Rough-In11/28/201811/29/201811/29/2018 8:55:51 AMAPASS
Jason Curley ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
Verified listing and scope of work for solar array install, everything checked just fine