Inspections for the day of: Wednesday, November 3, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM04-03126 Plumbing Rough-in11/2/200411/3/200411/3/2004 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/2/2004 at 11:40:23 AM. Contact: ###-####.
PLM04-03292 Sprinkler (Final)11/2/200411/3/200411/3/2004 12:00:00 AMAPASS
jon ###-#### sp final ok 11/3/2004 10:01:02 AM
PLM04-02048 Final11/2/200411/3/200411/3/2004 12:00:00 AMAFAIL
calk fixtures, test dcva, secure dcva, seal wall at waste, air gap t&p drain 11/3/2004 11:56:56 AM
PLM04-01772 Plumbing Rough-in11/2/200411/3/200411/3/2004 12:00:00 AMAFAIL
removing waste from fire wall, secure hose bibs 11/3/2004 3:31:48 PM
PLM04-03135 Water and/or Sewer11/3/200411/3/200411/3/2004 12:00:00 AMAPASS
air test ok final ok 11/3/2004 10:24:01 AM
PLM04-03126 Plumbing Rough-in11/3/200411/3/200411/3/2004 12:00:00 AMPPASS
needs vent tie in and hot water connection 11/3/2004 3:08:00 PM
PLM04-01770 Plumbing Rough-in11/3/200411/3/200411/3/2004 12:00:00 AMPFAIL
remove waste from fire wall, secure hose bibs 11/3/2004 3:32:08 PM
PLM04-03288 Plumbing Rough-in11/3/200411/3/200411/3/2004 12:00:00 AMPFAIL
Shayne is contact on job.; Phone #: ###-#### Internet Inspection Request from: Roger Patterson revent existing wc, tie new waste below wc, run 3/4 to water heater and 3/4 from addition to 3/4, 1/2 " hot to new 3/4 hot, new shower vent is backgraded, pipe t&p drain to existing. 11/3/2004 2:49:57 PM