ELE05-03104
| Final | 11/2/2005 | 11/3/2005 | 11/3/2005 5:26:27 PM | P | FAIL |
|
|
MAJOR REMODEL; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called contr, left corr notice, 408.4, panel schedule needs completed, 358.30(A) emt shall be supported,230.70(B) service disc shall be marked,800.52(B)shall remove abandoned cables,and install from struct part of bldg
|
ELE05-03278
| Electrical Rough-In | 11/3/2005 | 11/3/2005 | 11/3/2005 5:18:04 PM | P | CANC |
|
|
Need partial so structural can approve the building for cover. We are waiting for can lights to ship into town. All wiring is installed we are just waiting for the lights. The General Contractor has contacted the structural Inspector and he said if you give a partial rough-in they can start installing the exterior dryvit. Please call Brandon for any questions; Phone #: ###-#### Internet Inspection Request from: Celinda Winters called contr, told him this permit no. was used for t/s, and bldg permit states that each tenant space needs an indidual permit.
|
ELE05-02806
| Final | 11/3/2005 | 11/3/2005 | 11/3/2005 5:15:43 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Ryan Christensen still no panel schedules, covers off panels, said to finish that part of corrections before final.
|
ELE05-03273
| Electrical Rough-In | 11/3/2005 | 11/3/2005 | 11/3/2005 3:00:00 PM | P | PASS |
|
|
Rough-in on garage.; Phone #: ###-#### Internet Inspection Request from: Dana Moyer ric garage ok
|
ELE05-03575
| Final | 11/3/2005 | 11/3/2005 | 11/3/2005 2:49:27 PM | P | PASS |
|
|
Randy Note: 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final
|
ELE05-02706
| Final | 11/3/2005 | 11/3/2005 | 11/3/2005 12:47:34 PM | P | FAIL |
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa called contr, left corr notice, 210.8(A)(7) recpt in laundry shall be gfci, 410.8(D) closet lite shall be 6" from shelf, 110.3(B) garage 3-way switch shall operate correctly,680.73 access to jetted tub shall not be grouted in.
|
ELE05-03987
| Electrical Rough-In | 11/2/2005 | 11/3/2005 | 11/3/2005 10:25:05 AM | A | PASS |
|
|
call 30 min 1st before inps--dan-- ###-#### met elect, told to make-up and 1 place 11/4". ric ok
|
ELE05-03662
| Final | 11/2/2005 | 11/3/2005 | 11/3/2005 9:56:54 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Clyde called contr to change a/c bkr. ok to final
|
ELE05-01814
| Conference | 11/3/2005 | 11/3/2005 | 11/3/2005 9:54:29 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 11/3/2005 at 7:13:18 AM. Contact: ###-####. see ri
|
ELE05-03661
| Permanent Service | 11/3/2005 | 11/3/2005 | 11/3/2005 8:59:50 AM | P | PASS |
|
|
kendall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 3 meters req'd. p/s exst meter pak n ok
|
ELE05-03702
| Electrical Rough-In | 11/3/2005 | 11/3/2005 | 11/3/2005 8:57:44 AM | P | DONE |
|
|
kendall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore added 11/02 05
|
ELE05-03773
| Electrical Rough-In | 11/2/2005 | 11/3/2005 | 11/3/2005 8:56:22 AM | A | PASS |
|
|
kendall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie walls only ok to cover
|
ELE05-00855
| Electrical Rough-In | 11/2/2005 | 11/3/2005 | 11/3/2005 8:55:27 AM | A | PART |
|
|
Please call Lyle Dean if you have any questions.; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong looking at u/g by elect room, nw stairwell for f/a power and lites.
|
ELE05-02488
| Final | 11/2/2005 | 11/3/2005 | 11/3/2005 8:53:54 AM | A | PART |
|
|
josh -insp 2 elevators ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie # 2&3 elev ok to final, but need to do 1 ltr
|
ELE05-01814
| Electrical Rough-In | 11/3/2005 | 11/3/2005 | 11/3/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/3/2005 at 7:13:18 AM. Contact: ###-####. ok to pour gec
|