Inspections for the day of: Thursday, November 3, 2005.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-03104 Final11/2/200511/3/200511/3/2005 5:26:27 PMPFAIL
MAJOR REMODEL; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called contr, left corr notice, 408.4, panel schedule needs completed, 358.30(A) emt shall be supported,230.70(B) service disc shall be marked,800.52(B)shall remove abandoned cables,and install from struct part of bldg
ELE05-03278 Electrical Rough-In11/3/200511/3/200511/3/2005 5:18:04 PMPCANC
Need partial so structural can approve the building for cover. We are waiting for can lights to ship into town. All wiring is installed we are just waiting for the lights. The General Contractor has contacted the structural Inspector and he said if you give a partial rough-in they can start installing the exterior dryvit. Please call Brandon for any questions; Phone #: ###-#### Internet Inspection Request from: Celinda Winters called contr, told him this permit no. was used for t/s, and bldg permit states that each tenant space needs an indidual permit.
ELE05-02806 Final11/3/200511/3/200511/3/2005 5:15:43 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Ryan Christensen still no panel schedules, covers off panels, said to finish that part of corrections before final.
ELE05-03273 Electrical Rough-In11/3/200511/3/200511/3/2005 3:00:00 PMPPASS
Rough-in on garage.; Phone #: ###-#### Internet Inspection Request from: Dana Moyer ric garage ok
ELE05-03575 Final11/3/200511/3/200511/3/2005 2:49:27 PMPPASS
Randy Note: 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final
ELE05-02706 Final11/3/200511/3/200511/3/2005 12:47:34 PMPFAIL
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa called contr, left corr notice, 210.8(A)(7) recpt in laundry shall be gfci, 410.8(D) closet lite shall be 6" from shelf, 110.3(B) garage 3-way switch shall operate correctly,680.73 access to jetted tub shall not be grouted in.
ELE05-03987 Electrical Rough-In11/2/200511/3/200511/3/2005 10:25:05 AMAPASS
call 30 min 1st before inps--dan-- ###-#### met elect, told to make-up and 1 place 11/4". ric ok
ELE05-03662 Final11/2/200511/3/200511/3/2005 9:56:54 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Clyde called contr to change a/c bkr. ok to final
ELE05-01814 Conference11/3/200511/3/200511/3/2005 9:54:29 AMACANC
Scheduled by a contractor via Hello! on 11/3/2005 at 7:13:18 AM. Contact: ###-####. see ri
ELE05-03661 Permanent Service11/3/200511/3/200511/3/2005 8:59:50 AMPPASS
kendall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 3 meters req'd. p/s exst meter pak n ok
ELE05-03702 Electrical Rough-In11/3/200511/3/200511/3/2005 8:57:44 AMPDONE
kendall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore added 11/02 05
ELE05-03773 Electrical Rough-In11/2/200511/3/200511/3/2005 8:56:22 AMAPASS
kendall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie walls only ok to cover
ELE05-00855 Electrical Rough-In11/2/200511/3/200511/3/2005 8:55:27 AMAPART
Please call Lyle Dean if you have any questions.; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong looking at u/g by elect room, nw stairwell for f/a power and lites.
ELE05-02488 Final11/2/200511/3/200511/3/2005 8:53:54 AMAPART
josh -insp 2 elevators ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie # 2&3 elev ok to final, but need to do 1 ltr
ELE05-01814 Electrical Rough-In11/3/200511/3/200511/3/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/3/2005 at 7:13:18 AM. Contact: ###-####. ok to pour gec