FIR06-00017
| FIR-Aging Inspection | 11/3/2006 | 11/3/2006 | 11/7/2006 10:53:29 AM | | DEFR |
|
|
|
BLD06-00008
| FIRE-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 4:49:54 PM | P | CANC |
|
|
No time available to complete this inspection today.
|
MIS06-00287
| FIR-Final | 11/3/2006 | 11/3/2006 | 11/3/2006 4:49:18 PM | P | CANC |
|
|
Inspection to be rescheduled per conversation with contact.
|
FIR06-00691
| INSP-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 4:48:33 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR06-00589
| INSP-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 4:48:04 PM | P | FAIL |
|
|
Need to provide as-builts on site for field modifications not shown on approved plans, the voice evac failed to function on alarm test.
|
FIR06-00712
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 3:46:05 PM | P | CANC |
|
|
Contact: todd K; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
FIR06-00695
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 3:45:13 PM | P | CANC |
|
|
Contact: Todd K; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
FIR06-00694
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 3:44:53 PM | P | CANC |
|
|
Contact: Todd K; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
FIR06-00375
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 3:44:38 PM | P | CANC |
|
|
Contact: Todd K; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
BLD06-02060
| FIRE-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 3:44:15 PM | P | PASS |
|
|
Corrections verified, fire life safety passed inspection.
|
FIR06-00666
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 3:43:07 PM | P | PASS |
|
|
Fire alarm work completed satisfactory, permit finaled.
|
MIS06-00191
| BLD-Final | 11/3/2006 | 11/3/2006 | 11/3/2006 2:55:00 PM | P | PASS |
|
|
Required corrections have been verified at structrual final, inspection passed.
|
FIR06-00664
| INSP-Sprinkler Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 2:46:16 PM | A | PART |
|
|
The UG fire supply line stub out to approx. 8' and the riser stub are approved for cover.
|
MIS06-00291
| FIR-Final | 11/2/2006 | 11/3/2006 | 11/3/2006 2:16:08 PM | A | PASS |
|
|
Items on previous correction notice have been verified for completion, inspection passed.
|
FIR05-00827
| INSP-Sprinkler Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 2:00:28 PM | A | PART |
|
|
Two heads at the 1st floor corridor drop ceiling adjacent to the seismic separation assembly are good for cover.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 1:58:59 PM | A | PART |
|
|
OH rough-in at the 1st floor north tower corridor is okay to cover.
|
BLD06-01555
| FIRE-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 1:42:27 PM | A | FAIL |
|
|
The project related fire sprinkler permit must be finaled prior to life safety final.
|
FIR06-00507
| INSP-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 1:40:30 PM | A | CANC |
|
|
No time available to complete this inspection.
|
FIR06-00545
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 1:06:34 PM | P | PASS |
|
|
Per field inspection completed by S. Rogers, inspection passed.
|
FIR06-00831
| INSP-Final Inspection | 11/1/2006 | 11/3/2006 | 11/3/2006 12:32:24 PM | A | PART |
|
|
OH rough-in is good for cover at the drop ceiling areas except one office at the north side of the TI where one head is overspaced.
|
FIR06-00508
| INSP-Final Inspection | 11/1/2006 | 11/3/2006 | 11/3/2006 12:24:10 PM | A | NR |
|
|
Pending fire alarm completion.
|
BLD06-01044
| FIRE-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 11:41:48 AM | A | NR |
|
|
The alarm and sprinkler permits must be finaled prior to life safety final.
|
FIR06-00810
| INSP-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 11:23:29 AM | A | NR |
|
|
Per phone call from the contractor, the project is not ready for inspection due to HVAC equipment difficulties.
|
FIR06-00639
| INSP-Sprinkler Rough-in | 11/3/2006 | 11/3/2006 | 11/3/2006 11:07:13 AM | P | PART |
|
|
The 5th and 4th floors are approved for cover as noted on job shack plan set.
|
FIR06-00262
| INSP-Sprinkler Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 11:05:15 AM | A | DEFR |
|
|
Wrong permit number called in, was intended for the overhead permit work.
|
FIR05-00402
| INSP-Sprinkler Rough-in/Hydro | 11/2/2006 | 11/3/2006 | 11/3/2006 11:04:10 AM | A | PART |
|
|
Completed OH rough-in inspection for building 10, noted exposed 2" CPVC riser at 2nd floor to be concealed, three areas as noted on plans and indicated to contractor are subject to freeze potential and will require relocation of piping or approved tenting method prior to cover. 1st and 2nd floors only are approved for cover at this time, DP in the garage areas are not installed.
|
BLD06-02697
| FIRE-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 9:30:57 AM | A | PASS |
|
|
Corrections are complete, fire life safety passed.
|
BLD06-02696
| FIRE-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 9:29:03 AM | A | PASS |
|
|
Corrections have been made, inspection passed.
|
BLD06-01044
| FIRE-Alarm Testing | 11/2/2006 | 11/3/2006 | 11/3/2006 9:01:15 AM | A | CANC |
|
|
Duplicate inspection request.
|
FIR06-00463
| INSP-Final Inspection | 11/3/2006 | 11/3/2006 | 11/3/2006 12:00:00 AM | P | CANC |
|
|
call scott carter before going out ###-#### Internet Inspection Request from: Darla Downs
|