Inspections for the day of: Friday, November 3, 2006.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01419 Site Preparation11/3/200611/3/200611/6/2006 12:54:19 PMPPASS
Construction is underway, all bmp's are in place.
ESC05-01838 BMP Violation11/3/200611/3/200611/3/2006 11:40:40 AMPFAIL
c/n issued to address trash maintenance needed on site, and sediment along Mercer needs to be removed from gutter and pushed back behind curb. Sediment barrer needs to be replaced to prevent further problems. Notified RP, issues should be addressed by the end of the day on 11-6-06.
ESC05-01841 Site Final11/3/200611/3/200611/3/2006 11:32:19 AMPPASS
Final stabilization has been completed.