ELE08-02454
| Final | 11/3/2008 | 11/3/2008 | 11/3/2008 4:09:58 PM | P | NH |
|
|
Scheduled by a contractor via Hello! on 11/3/2008 at 7:32:37 AM. Contact: ###-####. called contractor, left card nh, fee due, no esc this project
|
ESC07-01432
| General Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 3:26:47 PM | P | PASS |
|
|
looked ok
|
ESC08-00527
| General Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 3:20:31 PM | P | PASS |
|
|
looked ok
|
ESC08-00908
| General Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 3:18:51 PM | A | PASS |
|
|
looked ok
|
ELE08-02943
| Electrical Rough-In | 11/3/2008 | 11/3/2008 | 11/3/2008 2:57:44 PM | P | PASS |
|
|
Please provide underground inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok to cover u/g in building from service to panel area only, no esc this project
|
ELE08-02423
| Electrical Rough-In | 11/3/2008 | 11/3/2008 | 11/3/2008 1:49:08 PM | P | PASS |
|
|
JASON BLDG 2 L4 UNITS D2, A2, C2, E1 & E2 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ric ok rooms, building 2, 3rd floor, anop
|
ELE08-02348
| Electrical Rough-In | 11/3/2008 | 11/3/2008 | 11/3/2008 12:37:38 PM | P | FAIL |
|
|
Not sure what to call this inspection. It is for the floor heat. Thanks Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot called, left message, left correction notice, NEC 110.3 shall install cable per manufacturers installation instructions- never at 1", always at least 2" spacing
|
ELE08-02940
| Conference | 10/31/2008 | 11/3/2008 | 11/3/2008 10:06:11 AM | A | NH |
|
|
brad-- call 1st before insp Phone #: ###-#### called 2x, drove by, nh, left message, no esc this project
|
ELE08-01283
| Final | 11/1/2008 | 11/3/2008 | 11/3/2008 9:24:43 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Joseph Zumwalt called contractor, ok to final, no esc this project
|
ELE08-02348
| Electrical Rough-In | 10/31/2008 | 11/3/2008 | 11/3/2008 9:08:23 AM | P | CANC |
|
|
Not sure what to call this inspection, but it is for the floor heat. Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot Inspection cancelled from web by: Barbara Szurgot
|
ELE08-02902
| Rough-In Permanent Service | 10/31/2008 | 11/3/2008 | 11/3/2008 8:28:36 AM | A | FAIL |
|
|
House will be open, if you have any questions, please call Clay. Thank You. Phone #: ###-#### Internet Inspection Request from: Clay Morgan called, left correction notice, NEC 250.53(G) electrode shall have upper end flush with or below ground at service, 250.52(A)(1) metal u/g water pipe shall be used for grounding electrde within 5' of entering buiding, 250.86 metal enclosure shall be grounded (down bath),300.4(A) edge of bored holes shall be 1 1/4" from edge of framing member-panel, kitchen header,210.52(A)(1) receptacles shall be spaced such that no point along floor line is over 6' from outlet-se bedroom, BCC shall change room count to 10 on permit
|