BLD08-01168
| FIRE-Conference | 11/3/2008 | 11/3/2008 | 11/3/2008 4:04:07 PM | P | DONE |
|
|
jerry Phone #: ###-####
|
BLD08-02242
| FIRE-Final Inspection | 10/31/2008 | 11/3/2008 | 11/3/2008 3:29:44 PM | P | PART |
|
|
A temporary occupancy was given until the items listed on the floor plan have been corrected.
|
BLD06-02059
| FIRE-Final Inspection | 10/31/2008 | 11/3/2008 | 11/3/2008 3:21:08 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 4:09:18 PM. Contact: ###-####.
|
FIR08-00595
| INSP-Sprinkler Rough-in/Hydro | 10/31/2008 | 11/3/2008 | 11/3/2008 12:25:46 PM | A | PASS |
|
|
Above ground hydro test passed.
|
BLD07-03134
| FIRE-Conference | 10/31/2008 | 11/3/2008 | 11/3/2008 12:25:13 PM | A | DONE |
|
|
Conference was for the placement of the electric alarm bell which I defered to the city approved sprinkler plans. I defered the knox box placement to Fire Station 9
|
FIR07-00874
| INSP-Sprinkler Rough-in/Hydro | 10/31/2008 | 11/3/2008 | 11/3/2008 12:23:59 PM | P | FAIL |
|
|
steven Phone #: ###-#### The contact phone number is wrong so I went to the job site and did not make contact in person. I called the field supervisor todd but could only leave a message on voice mail. Also the plans at the pipe machine are not the city approved. No inspection was performed and will need to be rescheduled.
|