BLD08-00620
| BLD-Final | 10/31/2008 | 11/3/2008 | 11/3/2008 4:46:14 PM | P | NR |
|
|
Kathy ###-#### please call 30 min prior to arrange for access
|
ESC08-00330
| Random Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 3:31:51 PM | P | CANC |
|
|
|
BLD08-00620
| BLD-Final | 11/3/2008 | 11/3/2008 | 11/3/2008 3:31:13 PM | A | CANC |
|
|
|
ESC08-00865
| Site Preparation | 11/3/2008 | 11/3/2008 | 11/3/2008 3:10:11 PM | | PART |
|
|
Needs to add di protection. Verbal c/n given to RP. Conc. washout has been installed.
|
BLD07-03106
| BLD-Final | 10/30/2008 | 11/3/2008 | 11/3/2008 2:19:02 PM | P | PASS |
|
|
Leanne- call 30 mins prior to going Phone #: ###-####. ok for perm occ.
|
BLD08-02059
| BLD-Energy code compliance | 11/3/2008 | 11/3/2008 | 11/3/2008 1:52:48 PM | P | PART |
|
|
todd - please call 1/2 hr prior Phone #: ###-####. Ok to cover kitchen and bathroom on main level only. Verified that bathroom vent was actually vented and also verified all point loads to basement and sills.
|
ESC08-00951
| Random Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 10:18:39 AM | A | PASS |
|
|
ESC permit sign posted. Site was clean.
|
BLD08-02324
| BLD-Foundation | 11/3/2008 | 11/3/2008 | 11/3/2008 10:17:57 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/3/2008 at 7:01:40 AM. Contact: ###-####. Perimeter stemwall.
|
BLD08-02323
| BLD-Foundation | 10/31/2008 | 11/3/2008 | 11/3/2008 10:17:28 AM | A | DEFR |
|
|
stem wall \\phil Phone #: ###-#### please call 1/2 hour prior to going. Stemwall already placed when arrived on site.
|
ESC08-00950
| Random Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 10:16:45 AM | A | PASS |
|
|
BMP's in place. ESC permit sign posted. General site conditions were good.
|