Inspections for the day of: Monday, November 3, 2008.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01406 General Inspection11/3/200811/3/200811/4/2008 8:39:17 AMPPASS
No major issues on site. Minor amounts of sediment on paved area from foot traffic.. Told framers not to park on lots and to park on street area instead.
ESC08-00464 Tracking Control11/3/200811/3/200811/3/2008 2:39:00 PMPCANC
Wrong Date.
ESC08-00532 Random Inspection11/2/200811/3/200811/3/2008 2:37:57 PMPPASS
ESC08-00464 Random Inspection11/2/200811/3/200811/3/2008 2:37:47 PMPFAIL
Need to maintain both entrances to the project area. Clean up all tracking off of the project area. Will re-inspect on 11/4/08 AM
ESC08-00891 Random Inspection11/2/200811/3/200811/3/2008 2:32:08 PMPNR
ESC07-00987 Tracking Control11/3/200811/3/200811/3/2008 2:29:01 PMPFAIL
Need to use other bmp's to eliminate tracking. Will re-inspect 11/4/08 AM.
ESC07-00987 Conference11/3/200811/3/200811/3/2008 1:35:41 PMPDONE
Went over the perventitive step to eliminate track form occuring during the wet season. Told Rp that no tracking is allowed. if tracking is still occuring , a different step willl be needed.
ESC08-00740 Site Final10/30/200811/3/200811/3/2008 11:11:21 AMAPASS
ESC08-00765 Site Preparation11/2/200811/3/200811/3/2008 10:58:47 AMAPART
Installing bmp's as we speak. Told the requirment for the entrances and to protect the irragation grid at the south east end with external protection. Clean up tracking off of the project area. Will re-inspect on 11/5/08.
ESC08-00770 BMP Violation10/31/200811/3/200811/3/2008 10:42:21 AMAPASS
ESC08-00629 General Inspection11/3/200811/3/200811/3/2008 10:32:08 AM FAIL
Need to clean up all tracking on the street area coming off of the project area. Also maintain the BMP's.
ESC08-00491 General Inspection11/2/200811/3/200811/3/2008 9:03:53 AMAFAIL
Need to maintain the construction enrtance by appling a larger rock not the 3/4 rock. At least a 2" washed rock. Also need to install a sediment barrier along the west end of the project at the staging area where the slope to the street is over a 2% grade. Clean up any and all tracking onto the paved areas. Will re-inspect on 11/05/08.
ESC08-00367 BMP Violation10/31/200811/3/200811/3/2008 8:16:16 AMAPASS
ESC08-00365 BMP Violation10/31/200811/3/200811/3/2008 8:16:02 AMAPASS
ESC08-00716 BMP Violation10/30/200811/3/200811/3/2008 8:09:14 AMAPASS
set up perimeter sediment controls on all sides of the project.