Inspections for the day of: Monday, November 3, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Rogers
TitleEROSION CONTROL INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00763 Site Preparation11/2/200811/3/200811/3/2008 3:53:45 PMAPASS
Contractor starting foundation excavation. No work today, site muddy. No track out issues.
ESC08-00722 Random Inspection10/28/200811/3/200811/3/2008 3:34:29 PMAPASS
ESC08-00638 Random Inspection10/27/200811/3/200811/3/2008 2:54:25 PMAPASS
ESC07-00904 Tracking Control10/31/200811/3/200811/3/2008 2:09:14 PMAPART
Contractor has installed a construction site entrance. Still minor track out onto warm springs, but generally looks ok.
ESC08-00941 Site Preparation11/3/200811/3/200811/3/2008 1:34:12 PM PASS
ESC05-01372 Site Final11/3/200811/3/200811/3/2008 12:59:09 PMPPASS
ESC08-00849 Random Inspection10/27/200811/3/200811/3/2008 10:41:14 AMAPASS
ESC08-00734 Site Preparation10/28/200811/3/200811/3/2008 10:34:07 AMAPASS
ESC08-00744 Site Preparation10/27/200811/3/200811/3/2008 10:21:48 AMAPASS
Contractor has put in a rock construction site entrance. Site is muddy today, but no work is taking place.
ESC05-01434 Site Final11/3/200811/3/200811/3/2008 9:19:10 AMPPASS
ESC08-00439 Random Inspection10/20/200811/3/200811/3/2008 9:17:34 AMAPASS
ESC08-00421 Random Inspection10/27/200811/3/200811/3/2008 9:02:15 AMAPASS
ESC06-00418 Site Final11/3/200811/3/200811/3/2008 9:01:44 AMPPASS
Development is stable. All lots overgrowen with weeds. No construction on any lots.