FIR09-00583
| INSP-Conference | 11/3/2009 | 11/3/2009 | 11/3/2009 4:12:59 PM | P | DONE |
|
|
Regarding location of new notification appliances including H/S and horn only devices.
|
FIR09-00376
| INSP-Conference | 11/3/2009 | 11/3/2009 | 11/3/2009 4:11:55 PM | P | DONE |
|
|
Regarding requirements per NFPA13 2007 sec. 8.6.7.1 and 8.6.7.2.
|
BLD09-01640
| FIRE-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 4:10:53 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable, corrections finished while on site.
|
BLD09-01337
| FIRE-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 4:09:49 PM | P | NR |
|
|
Pending project related fire alarm permit work final.
|
FIR09-00587
| INSP-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 4:09:16 PM | P | FAIL |
|
|
Noted one overspaced notification device, one obstructed horn/strobe at the engineer room, one existing strobe is mounted too high, per contractor new and existing notification circut appliances are not in synchronization.
|
FIR09-00418
| INSP-Conference | 11/3/2009 | 11/3/2009 | 11/3/2009 4:06:27 PM | A | DONE |
|
|
Regarding fire code review notes items.
|
FIR09-00625
| INSP-Final Inspection | 11/2/2009 | 11/3/2009 | 11/3/2009 4:05:22 PM | A | PASS |
|
|
Hood suppression system functioned properly under test conditions, contractor to provide separation at fryer and range as discussed.
|