BLD09-01808
| FIRE-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 3:25:40 PM | P | FAIL |
|
|
Todays inspection was actually a conference about cover. Sheet rock is ok to be installed by Fire pending the other inspectors approvals.
|
BLD09-01771
| FIRE-Final Inspection | 11/2/2009 | 11/3/2009 | 11/3/2009 3:21:07 PM | P | CANC |
|
|
chancey Phone #: ###-####
|
FIR09-00611
| INSP-Sprinkler Rough-in | 11/3/2009 | 11/3/2009 | 11/3/2009 1:43:42 PM | P | PASS |
|
|
Phase 2 sprinkler piping can be covered. Insulation at the deck needs re-attached and will be verified at the building final.
|
FIR09-00534
| INSP-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 1:42:45 PM | P | FAIL |
|
|
The general contractor removed ceiling tile.
|
BLD07-02208
| FIRE-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 1:42:04 PM | P | FAIL |
|
|
Provide the correct 2A fire extinguishers as discussed. Smoke alarms tested ok.
|
BLD07-02202
| FIRE-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 1:41:48 PM | P | FAIL |
|
|
Provide the correct 2A fire extinguishers as discussed. Smoke alarms tested ok.
|
BLD08-02539
| BLD-Aging Inspection | 11/2/2009 | 11/3/2009 | 11/3/2009 10:47:00 AM | A | DONE |
|
|
Fire final inspection is scheduled for tomorrow.
|