PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, November 3, 2009
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00521
Site Preparation
11/3/2009
11/3/2009
11/5/2009 2:20:36 PM
FAIL
Verbal to RP:
Clean up all lots where trash and debris need to be containerized and or removed.
Sweep all sediment and debris off of ALL hard surfaces. Protect all stockpiles and lot with a 2% gade or greaated with a sediment barrier. Will re-inspect on 11/6/09 PM
ESC09-00652
Site Preparation
11/3/2009
11/3/2009
11/4/2009 10:05:11 AM
PASS
ESC09-00653
Site Preparation
11/3/2009
11/3/2009
11/4/2009 10:05:04 AM
PASS
ESC08-00629
General Inspection
11/3/2009
11/3/2009
11/3/2009 3:13:19 PM
PASS
ESC09-00693
Site Preparation
11/2/2009
11/3/2009
11/3/2009 3:01:42 PM
A
PART
Post ESC sign at front of project.
ESC09-00543
General Inspection
11/3/2009
11/3/2009
11/3/2009 2:27:51 PM
P
PART
Set up a meeting with RP to go over plan and conditions of site.
ESC09-00507
General Inspection
10/30/2009
11/3/2009
11/3/2009 2:25:31 PM
A
CANC
Moved till 11/4/09am
ESC09-00666
Site Preparation
11/3/2009
11/3/2009
11/3/2009 12:06:18 PM
PASS
ESC08-00952
Conference
11/3/2009
11/3/2009
11/3/2009 11:42:07 AM
A
DONE
Spoke with RP:
RP is leaving Lure Construction. TOld him they must provide a new RP by 11/6/09am. Also was told that it might switch over to the contractor that is buildingthe retirement facility within the developement. Will re-inspect on 11/9/09 for changes.
ESC09-00594
Tracking Control
10/30/2009
11/3/2009
11/3/2009 10:48:52 AM
A
PASS
ESC09-00679
Site Preparation
11/3/2009
11/3/2009
11/3/2009 9:53:21 AM
PASS
ESC09-00160
General Inspection
11/3/2009
11/3/2009
11/3/2009 8:54:54 AM
A
FAIL
Message to RP:
Clean up roadway of all sediment from where landscaping occured. Will re-inspect on 11/5/09AM
ESC08-00952
Site Final
11/2/2009
11/3/2009
11/3/2009 6:03:16 AM
A
CANC
Moved to a confrence.