FIR10-00355
| INSP-Sprinkler Rough-in/Hydro | 11/2/2010 | 11/3/2010 | 11/3/2010 5:18:27 PM | P | PART |
|
|
Overhead hydrostatic test of the new dry system passed.
|
FIR03-00029
| FIR-Aging Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 3:44:07 PM | | PASS |
|
|
|
FIR03-00230
| FIR-Aging Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 3:42:44 PM | | PASS |
|
|
|
FIR03-00397
| FIR-Aging Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 3:38:09 PM | | FAIL |
|
|
No call for inspection. Contractor no longer in operation.
|
FIR10-00526
| INSP-Final Inspection | 11/2/2010 | 11/3/2010 | 11/3/2010 3:35:03 PM | P | NR |
|
|
Not ready for inspection per phone conversation with contractor. To be rescheduled as discussed.
|
FIR10-00213
| FIR-Aging Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 3:33:37 PM | A | PART |
|
|
See activity notes 5/20.
|
FIR10-00125
| INSP-Sprinkler Rough-in | 11/3/2010 | 11/3/2010 | 11/3/2010 3:31:45 PM | A | PART |
|
|
Demo work completed.
|
BLD09-01620
| FIRE-Final Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 3:30:56 PM | A | PASS |
|
|
Fire life safety finaled.
|
BLD10-02384
| FIRE-Sprinkler Rough-in | 11/3/2010 | 11/3/2010 | 11/3/2010 3:29:44 PM | A | PART |
|
|
Project related fire sprinkler work okayed for cover.
|