Inspections for the day of: Monday, November 3, 2014.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02878 BLD-Framing/Rough-in11/3/201411/3/201411/5/2014 10:07:33 AMPPASS
John Phone #: ###-####
BLD14-02370 BLD-Final10/31/201411/3/201411/3/2014 8:27:39 PMPCANC
Mark Phone #: ###-####
BLD14-03049 BLD-Foundation11/3/201411/3/201411/3/2014 3:25:48 PMPPASS
Adam// concrete set for 4:30pm Phone #: ###-####
GCB14-00126 GCB-Framing10/31/201411/3/201411/3/2014 12:28:50 PMAFAIL
Grey ###-####
All ok except for hold downs to be installed a front wall of house. OK to insulate. Will check HDs at energy code insp.
MIS14-00273 BLD-Conference10/31/201411/3/201411/3/2014 11:13:01 AMADONE
complaint interior remodel without permit, and new siding
Contractor needs Bldg, Mech, Plumb, and Electr permits Stop Work posted on window. Cameron (Contr.) notified. FJC EGJF