FIR14-00377
| INSP-Sprinkler Rough-in | 11/3/2014 | 11/3/2014 | 11/3/2014 4:26:32 PM | P | PART |
|
|
OH rough-in inspection at mains and branchlines completed in conjunction with hydrostatic testing 10/8.
|
BLD14-02541
| FIRE-Final Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 4:11:06 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable. Items to be done prior to structural final include; remove manual thumbturn at the main entry/exit, post correct address numbers to match.
|
BLD14-01457
| FIRE-Conference | 11/3/2014 | 11/3/2014 | 11/3/2014 2:11:08 PM | P | DONE |
|
|
Mike-please call Mike to meet, needs soffit and can inspections Phone #: ###-#### *Re WUI construction requirements per FD ordinance.
|
BLD13-01571
| FIRE-Final Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 2:03:33 PM | P | PASS |
|
|
Verified corrections are complete per previous inspection notes. Fire life safety passed.
|
BLD14-00613
| FIRE-Final Inspection | 10/31/2014 | 11/3/2014 | 11/3/2014 1:38:06 PM | P | PASS |
|
|
Previous correction items are finished with the exception of building address numbers, new EM light at the restroom hallway needs repaired. Items to be completed prior to structural final as discussed. Note: *no signature card available on site at the time of inspection.
|
FIR14-00639
| INSP-Sprinkler Rough-in/Hydro | 11/3/2014 | 11/3/2014 | 11/3/2014 11:12:11 AM | A | PART |
|
|
Coverage at the mechanical room okayed. Final pending ceiling tile and escutcheons.
|
FIR14-00558
| INSP-Final Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 11:00:18 AM | A | PASS |
|
|
Scope of demo permit work completed.
|
FIR14-00783
| INSP-Sprinkler Rough-in | 11/3/2014 | 11/3/2014 | 11/3/2014 10:59:02 AM | A | PART |
|
|
Ref. dated plan annotations for areas inspected.
|