Inspections for the day of: Monday, November 3, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00377 INSP-Sprinkler Rough-in11/3/201411/3/201411/3/2014 4:26:32 PMPPART
OH rough-in inspection at mains and branchlines completed in conjunction with hydrostatic testing 10/8.
BLD14-02541 FIRE-Final Inspection11/3/201411/3/201411/3/2014 4:11:06 PMPPASS
Fire life safety inspection completed acceptable. Items to be done prior to structural final include; remove manual thumbturn at the main entry/exit, post correct address numbers to match.
BLD14-01457 FIRE-Conference11/3/201411/3/201411/3/2014 2:11:08 PMPDONE
Mike-please call Mike to meet, needs soffit and can inspections Phone #: ###-#### *Re WUI construction requirements per FD ordinance.
BLD13-01571 FIRE-Final Inspection11/3/201411/3/201411/3/2014 2:03:33 PMPPASS
Verified corrections are complete per previous inspection notes. Fire life safety passed.
BLD14-00613 FIRE-Final Inspection10/31/201411/3/201411/3/2014 1:38:06 PMPPASS
Previous correction items are finished with the exception of building address numbers, new EM light at the restroom hallway needs repaired. Items to be completed prior to structural final as discussed. Note: *no signature card available on site at the time of inspection.
FIR14-00639 INSP-Sprinkler Rough-in/Hydro11/3/201411/3/201411/3/2014 11:12:11 AMAPART
Coverage at the mechanical room okayed. Final pending ceiling tile and escutcheons.
FIR14-00558 INSP-Final Inspection11/3/201411/3/201411/3/2014 11:00:18 AMAPASS
Scope of demo permit work completed.
FIR14-00783 INSP-Sprinkler Rough-in11/3/201411/3/201411/3/2014 10:59:02 AMAPART
Ref. dated plan annotations for areas inspected.