GCB14-00099
| FIRE-Final Inspection | 11/2/2015 | 11/3/2015 | 11/4/2015 2:17:17 PM | A | PASS |
|
|
Fire Life Safety Pass.
Riser room signage, map at annuciator with FACP and riser call outs and device map at FACP verified
|
NAF15-00006
| INSP-Final | 11/2/2015 | 11/3/2015 | 11/4/2015 2:09:08 PM | P | CANC |
|
|
Cancelled reschuduled for tomorrow.
|
NAF15-00014
| INSP-Final | 11/2/2015 | 11/3/2015 | 11/4/2015 8:09:14 AM | A | CANC |
|
|
Cancelled per phone call with contractor.
|
NAF15-00025
| INSP-Supply line flush | 11/3/2015 | 11/3/2015 | 11/3/2015 10:33:31 AM | A | DONE |
|
|
Early Start Inspection for riser stub in. Riser ok to pour floor slab, discussed pouring around a ring for seismic protection. Verified appropriate depth on stub outside of building footing. End of pipe submerged in dirt, unsure if capped, ensure flush is done well at later date.
|
NAF15-00024
| INSP-Supply line flush | 11/2/2015 | 11/3/2015 | 11/2/2015 4:05:11 PM | A | PASS |
|
|
Contractor excavated trench more so that no berm as previously agreed upon would be required. Depth of cover is good, ok to cover.
Pump house has walls, rooft and door. No floor drain as required is installed. Mentioned to Anthony.
|