BLD17-00591
| FIRE-Final Inspection | 11/3/2017 | 11/3/2017 | 11/3/2017 3:15:33 PM | P | FAIL |
|
|
Provide annual inspection for the fire extinguisher, remove the thumbturn deadbolt from the west basement door and provide keyed on the egress side (remove thumbturn deadbolt) on the main entrance to the basement and provide sticker as discussed.
Mike Phone #: ###-####
|
BLD17-02999
| FIRE-Final Inspection | 10/27/2017 | 11/3/2017 | 11/3/2017 3:06:38 PM | P | PASS |
|
|
Life safety passed.
|
FIR17-00640
| INSP-Sprinkler Rough-in | 11/2/2017 | 11/3/2017 | 11/3/2017 3:06:14 PM | A | PASS |
|
|
The piping in the offices along the west wall, as marked on the plans with todays date, are ok to cover.
|
FIR17-00042
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 1:39:59 PM | P | PASS |
|
|
Overhead hydro test passed. Did not have time to perform the rough-in
|
BLD17-01089
| FIRE-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 1:06:26 PM | A | PASS |
|
|
life safety passed
Jose Phone #: ###-####
|
FIR17-00611
| INSP-Final Inspection | 11/3/2017 | 11/3/2017 | 11/3/2017 11:29:22 AM | P | CANC |
|
|
contact Leroy Anderson ###-#### 30 min prior to Final Insp start please.
Thank YOU, Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
FIR17-00648
| INSP-Final Inspection | 11/3/2017 | 11/3/2017 | 11/3/2017 11:25:26 AM | P | CANC |
|
|
Ray McQueen, inspecting technician, requests latest appointment if possible. Building access: open until 1700. Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
FIR17-00601
| INSP-Final Inspection | 10/31/2017 | 11/3/2017 | 11/3/2017 11:13:01 AM | A | CANC |
|
|
Canceled until approved plans can be found.
Brandon Phone #: ###-####
|
FIR17-00602
| INSP-Final Inspection | 10/31/2017 | 11/3/2017 | 11/3/2017 11:12:36 AM | A | FAIL |
|
|
No city approved plans/documents. No inspection performed.
Brandon Phone #: ###-####
|
FIR16-00784
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 10:23:32 AM | A | PASS |
|
|
Permit finaled. Previous corrections have been made
|
FIR17-00363
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 9:31:51 AM | A | PASS |
|
|
Permit finaled
Rick Phone #: ###-####
|
FIR17-00205
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 9:31:31 AM | A | PASS |
|
|
Permit finaled
Rick Phone #: ###-####
|
FIR17-00532
| INSP-Final Inspection | 11/1/2017 | 11/3/2017 | 11/3/2017 8:22:41 AM | A | CANC |
|
|
Contractor was not able to meet at the same time I was available. Will need to be rescheduled
please call 1/2hour prior Phone #: ###-#### Inspection requested via web by Rick Groom
|
FIR17-00524
| INSP-Final Inspection | 11/1/2017 | 11/3/2017 | 11/3/2017 8:22:23 AM | A | CANC |
|
|
Contractor was not able to meet at the same time I was available. Will need to be rescheduled
please call 1/2hour prior Phone #: ###-#### Inspection requested via web by Rick Groom
|
FIR17-00257
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 8:21:27 AM | A | FAIL |
|
|
Called contact and left message on voice mail. Went to job and did not make contact. I noted that final inspections are scheduled but no rough-in inspection has been performed. Ceilings will need to be removed for verification of hangers and piping.
Mike Martin is requesting a final inspection for the 11th floor elevator lobby of US Bank. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00336
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 8:21:03 AM | A | FAIL |
|
|
Called contact and left message on voice mail. Went to job and did not make contact. I noted that final inspections are scheduled but no rough-in inspection has been performed. Ceilings will need to be removed for verification of hangers and piping.
Mike Martin is requesting a final inspection for the 10th floor elevator lobby of US Bank. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00517
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 8:20:26 AM | A | FAIL |
|
|
Called contact and left message on voice mail. Went to job and did not make contact. I noted that final inspections are scheduled but no rough-in inspection has been performed. Ceilings will need to be removed for verification of hangers and piping.
Mike Martin is requesting a final inspection for the 11th floor of US Bank. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00516
| INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 8:19:48 AM | A | FAIL |
|
|
Called contact and left message on voice mail. Went to job and did not make contact. I noted that final inspections are scheduled but no rough-in inspection has been performed. Ceilings will need to be removed for verification of hangers and piping.
Mike Martin is requesting a final inspection for the 10th floor of US Bank. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00617
| INSP-Supply line flush | 11/2/2017 | 11/3/2017 | 11/3/2017 7:24:23 AM | A | PASS |
|
|
Underground supply line fluch passed. Jeff got 3psi out of the 4" flushing outlet
|
FIR17-00042
| INSP-Final Inspection | 11/1/2017 | 11/3/2017 | 11/2/2017 3:59:49 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sheldon Gray Inspection cancelled from web by: Jessia Maxwell
|