MEC95-01962
| INSP - Framing/ Rough-in | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - ROUGH-IN IS OK
|
MEC95-01958
| INSP - Rough-in & Gas Pressure | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | A | PART |
|
|
11/30/95 350 - GAS PIPING OK #27389 CONFERENCE
|
MEC95-01765
| INSP - Gas pressure test | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | A | PASS |
|
|
11/30/95 350 - GAS PIPING OK #27385 FURNACE OK FINAL
|
MEC95-01915
| INSP - Final | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | A | PASS |
|
|
CALL ###-#### FOR ACCESS
|
MEC95-01915
| INSP - Final | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | A | PASS |
|
|
CALL ###-#### FOR ACCESS
|
MEC3046138
| INSP - Final | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | A | PASS |
|
|
11/29/95 350 - TEMP OCC GROUND LEVEL CHECK WITH WENDY BY FRIDAY... FINAL FOR CHAPEL AND GROUND FLOOR UNDERNEATH
|
MEC3046138
| INSP - Final | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | A | PASS |
|
|
11/29/95 350 - TEMP OCC GROUND LEVEL CHECK WITH WENDY BY FRIDAY... FINAL FOR CHAPEL AND GROUND FLOOR UNDERNEATH
|
MEC95-00182
| INSP - Final | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - REINSPECTION FINAL
|
MEC95-00182
| INSP - Final | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - REINSPECTION FINAL
|
MEC95-00224
| INSP - Final | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - FINAL
|
MEC95-00224
| INSP - Final | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - FINAL
|
MEC95-00623
| INSP - Final | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - FINAL
|
MEC95-00623
| INSP - Final | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - FINAL
|
MEC95-01705
| INSP - Final | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - REINSPECTION FINAL ROOFTOP UNIT VENT WAS EXTENDED 36" HIGHER THAN THE OTHER ROOFTOPS INTAKE OPENING THAT WAS WITHIN 10' OF VENT.
|
MEC95-01705
| INSP - Final | 11/30/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - REINSPECTION FINAL ROOFTOP UNIT VENT WAS EXTENDED 36" HIGHER THAN THE OTHER ROOFTOPS INTAKE OPENING THAT WAS WITHIN 10' OF VENT.
|
MEC95-01937
| INSP - Retro Fit (check note) | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
###-#### ONLY IN THE AFTER NOON.....
|
MEC95-01850
| INSP - Gas pressure test | 11/29/1995 | 11/30/1995 | 11/30/1995 12:00:00 AM | P | PASS |
|
|
11/30/95 350 - THIS IS READY THURS PM//DIX GAS PIPING OK #27386
|