Inspections for the day of: Tuesday, November 30, 1999.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-03728 Final11/29/199911/30/199911/30/1999 12:00:00 AMAFAIL
todd ###-#### fn Not ready.
MEC99-03638 Final11/29/199911/30/199911/30/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/29/1999 at 13:04:47. Contact: ###-####. No card onsite.
MEC99-03094 Pressure Test11/29/199911/30/199911/30/1999 12:00:00 AMAPASS
REINSPECTION BRANDON ###-####
MEC99-03417 Final11/29/199911/30/199911/30/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/29/1999 at 14:05:45. Contact: ###-####. Not ready.
MEC99-03876 Final11/29/199911/30/199911/30/1999 12:00:00 AMAPASS
todd-###-#### fn
MEC99-03882 Final11/30/199911/30/199911/30/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/30/1999 at 07:17:08. Contact: ###-####. No access.
MEC99-03041 Final11/30/199911/30/199911/30/1999 12:00:00 AMPPASS
tom ###-#### 1st floor Sign occ. Card.
MEC99-03609 Final11/30/199911/30/199911/30/1999 12:00:00 AMPPASS
3rd floor final ###-#### Sign Occ. Card.
BLD98-02719 BLD-Final11/30/199911/30/199911/30/1999 12:00:00 AMPCANC
late as possible Rick Peterson ###-####hm. after 3:30. before at ###-#### wrk. Unable to be on job a specified time of 3:30, called owner.
MEC99-03095 Final11/30/199911/30/199911/30/1999 12:00:00 AMPPASS
karen ###-#### fn insp Sign occ. Card.
MEC99-03093 Final11/30/199911/30/199911/30/1999 12:00:00 AMPPASS
###-#### fn insp Sign occ. Card.
MEC99-03094 Final11/30/199911/30/199911/30/1999 12:00:00 AMPPASS
###-#### fn insp Sign occ. Card.
MEC99-03728 Final11/30/199911/30/199911/30/1999 12:00:00 AMPFAIL
TODD ###-#### Corrections.