BLD00-02794
| BLD-Foundation | 11/29/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | A | PASS |
|
|
found -###-#### phil
|
BLD00-03005
| BLD-Framing/Rough-in | 11/29/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 16:24:02. Contact: ###-####.
|
BLD00-01777
| BLD-Final | 11/30/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 07:38:40. Contact: ###-####. need change from arc. for canopy to metal covering from approved cloth. 11/30/2000 1:21:10 PM
|
BLD00-00758
| BLD-Framing/Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | P | PART |
|
|
HARRY ###-#### ft work in progess. framing 2 nd floor roof ceilling ok for cover letter of observation on site. shaft verified to be complet. rfi requisted for post strap nailling 16 d nails used 10 d nails. pending responce. letter copy to be sent on strucrual observation of roof to be sent to dan stuart. 11/30/2000 2:28:40 PM
|
MEC00-03530
| Final | 11/30/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 09:09:43. Contact: . no # to contact. un able to locate house. no insp. performed. 11/30/2000 5:14:53 PM
|
BLD00-01839
| BLD-Final | 11/30/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | P | PASS |
|
|
FN OCC -- HERB ###-#### ok for occ. final ok signed photo copy on site. 11/30/2000 2:41:02 PM
|
BLD00-01563
| BLD-Concrete | 11/29/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 06:35:34. Contact: ###-####. placed with special insp pending report. 11/30/2000 5:15:24 PM
|
BLD00-01648
| BLD-Framing/Rough-in | 11/29/2000 | 11/30/2000 | 11/30/2000 12:00:00 AM | P | PART |
|
|
RE-INSP FR-- CRAIG-- ###-#### c/n on site ok to start insulation. 11/30/2000 4:34:37 PM
|