BLD98-03705
| BLD-Concrete | 11/30/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/30/2001 at 05:47:38. Contact: ###-####. initial caisson at SW corner...rec'd geo report regarding req'd depth for brg...met w/ Mti insp Mike Spiker & geolgist at site...observed boring and placement of slip form, rebar cage made onsite to be lowered into partial filled caisson. 4000psi conc req'd...(pending report) need remainder blow tests as req'd 11/30/2001 1:42:58 PM 11/30/2001 1:43:05 PM 11/30/2001 1:43:30 PM
|
MIS01-00227
| BLD-Final | 11/29/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | A | PART |
|
|
###-#### piky, verbal correction to post oc. load sign; ok for t/o (ok per Rick J. for fire , too) 11/30/2001 2:34:43 PM
|
BLD00-03649
| BLD-Framing/Rough-in | 11/29/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 16:35:42. Contact: ###-####....need sprinklers ok'd, recall 11/30/2001 5:23:17 PM
|
MEC01-03517
| Final | 11/29/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 16:48:42. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/30/2001 at 07:59:40.
|
BLD01-02570
| BLD-Framing/Rough-in | 11/30/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | P | PART |
|
|
###-#### HARRY
|
BLD00-03337
| BLD-Conference | 11/30/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 11/30/2001 2:35:23 PM w/ Darrel...will call for final.
|
BLD01-02570
| BLD-Energy code compliance | 11/30/2001 | 11/30/2001 | 11/30/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 11/30/2001 2:49:12 PM
|